Loading...
Devonshire 1-CS 920903COPPELL PUBLIC WORKS DATE: TO: FROM: RE: September 3, 1992 Steven G. Goram, Director of Public Works Rey Gonzales, Street Superintendent~ Retaining Wall Along Coppell Road; Concerns Expressed By Mr. Walter Pettijohn (Tickler 9/3/92) The developer has started the project on the ditch in front of Devonshire. I informed Larry Davis to let the contractor know that they need to repair the surface failures above and behind the retaining wall as part of their project. Next status 9/29/92. RG/bc STRETWA.RG