Devonshire 1-CS 920903COPPELL PUBLIC WORKS
DATE:
TO:
FROM:
RE:
September 3, 1992
Steven G. Goram, Director of Public Works
Rey Gonzales, Street Superintendent~
Retaining Wall Along Coppell Road; Concerns Expressed
By Mr. Walter Pettijohn
(Tickler 9/3/92)
The developer has started the project on the ditch in front of
Devonshire. I informed Larry Davis to let the contractor know that
they need to repair the surface failures above and behind the
retaining wall as part of their project. Next status 9/29/92.
RG/bc
STRETWA.RG