Loading...
Devonshire 1-CS 920728COPPELL PUBLIC WORKS DATE: TO: FROM: RE: July 28, 1992 Steven G. Goram, Director of Public Works Rey Gonzales, Street Superintenden~ Retaining Wall Along Coppell Road; Concerns Expressed by Mr. Walter Pettijohn (Tickler 7/30/92} According to Ken Griffin, he has requested that Larry Davis monitor the retaining wall project in front of Devonshire. The developer is going to establish a concrete footing for the retaining wall which will be attached to the existing wall. The developer will also be removing material behind the wall in three locations to recompact the material. The proposed plans for these improvements have been approved and the developer is lining up a contractor at this time. Next status 8/14/92. RG/bc STRETWA.RG