Loading...
Devonshire 1-CS 920515COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: May 15, 1992 Steven G. Goram, Director of Public Works Rey Gonzales, Streets Superintendent~ Retaining Wall Along coppell Road; Mr. Walter Pettijohn (Tickler 5/12/92) Concerns Expressed by The Phase II plans are currently in the review process. I spoke with Brad Meyers concerning the proposed plans on the retaining wall improvements and he advised that he has submitted them to Engineering. I have contacted Shohre and told her we needed to see these plans as soon as possible. Next status 5/26/92. RG/bc STRETWA.RG2