Loading...
Devonshire 1-CS 920220Cfi\' COPPELL ]PUBLIC WORKB MBMOP~NDUM tilL PUc':,." ,~ORKS DATE~ TO: FROM: Fobru&r~ 20~ 1992 []~, Alan D. Ratliff, City Manager _ Steven G. Goram, Director of Public Wo Drainage Concern -- Coppell Road During citizens appearances at the February 11, 1992 Council meeting one of our citizens, Walter Pettijohn, referred to a drainage facility on Coppell Road. He expressed concern of the safety at this particular location which is directly in front of the Devonshire subdivision and part of the project in this area. The ditch in question has a railroad tie retaining wall that was placed approximately 4 feet from the edge of the pavement and is an average depth of 3.5 feet. The placement of .this retainer wall was discouraged; staff suggested an underground system at this location instead. At the time, staff was informed Engineering was negotiating with the developer the possibility of constructing an enclosed system. I have discussed this with Ken Griffin and it may be appropriate that the three of us, along with Gary Sieb, discuss this matter. SGG/bc . : cc: Gary Sieb: Director, Planning & Community serviCes KR:; ~ornizfaf~en;,CsittrYeeE~:gsiun;eerrintendent~. ..,/~_,/~~ PWDRCOPRD. SGG /'¢' z-'~"~'-'~' ~ ~