Devonshire 1-CS 920309COPPELL PUBLIC WORKS
MEMORANDUM
DATE: March 9, 1992
TO: Alan D. Ratliff,
FROM: Steven G. Goram,
RE:
city Manager
Director of Public Wor
Retaining Wall Along Coppell Road; Concerns Expressed
by Mr. Walter Pettijohn
Ken Griffin and I met in regard to the above referenced matter.
After reviewing this it was determined that a guardrail would
resolve the concerns expressed by Mr. Pettijohn. Ken will contact
the developer to see if they would be receptive to funding and
installing the guardrail. Should the developer wish not to, we may
have most of the materials needed on hand at the West Service
Center to install the guardrail at a minimal cost.
will give you a status report on March 16, 1992.
SGG/sm
cc: Ken Griffin, City Engineer