Loading...
Devonshire 1-CS 920309COPPELL PUBLIC WORKS MEMORANDUM DATE: March 9, 1992 TO: Alan D. Ratliff, FROM: Steven G. Goram, RE: city Manager Director of Public Wor Retaining Wall Along Coppell Road; Concerns Expressed by Mr. Walter Pettijohn Ken Griffin and I met in regard to the above referenced matter. After reviewing this it was determined that a guardrail would resolve the concerns expressed by Mr. Pettijohn. Ken will contact the developer to see if they would be receptive to funding and installing the guardrail. Should the developer wish not to, we may have most of the materials needed on hand at the West Service Center to install the guardrail at a minimal cost. will give you a status report on March 16, 1992. SGG/sm cc: Ken Griffin, City Engineer