ST9302-LR 981030ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
DAILY FIELD REPORT
TESTED FOR: CITY OF COPPELL
COPPELL, TEXAS
DATE: 10/30/98
PROJECT: SANDY LAKE ROAD OUR REPORT NO: 98881-1
PROJECT NO. ST 93-02
COPPELL, TEXAS
TECHNICIAN: D.H.
WEATHER: CLOUDY
TEMPERATURE RANGE:
78 TO 78
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING
WORK AND PERFORM FIELD TESTING AS REQUESTED.
WHILE ON SITE THE TECHNICIAN OBTAINED 3 SOIL SAMPLES FOR LABORATORY PROCTOR ANALYSIS. THE
SAMPLES WERE OBTAINED FROM THE FOLLOWING LOCATIONS:
-SANDY LAKE ROAD UTILITIES AT STATION #1+00
-SANDY LAKE ROAD UTILITIES AT STATION #1+10
-SANDY LAKE ROAD UTILITIES AT STATION #97+50
A TOTAL OF 2 FIELD DENSITY TESTS WERE PERFORMED ON FILL FOR UTILITIES. SITE REPRESENTATIVE
WAS INFORMED THAT RESULTS WOULD BE AVABILABLE AS SOON AS LABORATORY TESTING WAS
COMPLETE.
LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A
SEPARATE REPORT.
AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS
OFFICE.
R~;~Ctfully Submitted
ALPHA, T~
~eotechr~co/~ · ~ Moten~ Tesi/n~ · ~~~ · ~
ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
REPORT OF FIELD
COMPACTION TESTS
TESTED FOR CITY OF COPPELL DATE 10130198
COPPELL, TEXAS
PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-1A
PROJECT NO~ ST 93-02
COPPELL, TEXAS
TEST DATA:
TEST ~ ELEV. SOIL ID ~ ~uu~ L~ ~ ~LACE ~ PLACE PERCENT
NO. DATED~T~ N~BER ~E ~ ~ ~ ~Y ~ ~A~ C~.~EN~
2 1~ FG 3 13.3 117.6 16.2 110 93 1-B
TEST LOCATION: UTILITIES
I 27" RCP STORM SEWER AT STATION ~t97+75
2 27" RCP STORM SE~q~R AT STATION t~7+~0
1. FILL
2. NATURAL SUBI~RADE
3. UME STABILIZED
4. CEMENT TREATED
* & IN PLACE PERCENT MOI~I'URE AND PERC~EI~ COMP~ CX~I~PLY ~ SPECIFICAllON~
B. PERCENT COMPACTtON DOES NOT COMPLY ~rH 8~-ClFICATIONS
C. PERCENT iN PLACE MOk~tURE DOES NOT COMPLY WTTH SPECIFICATI(~S
D, RETEST