Wynnpage North 1-CS050929DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM
Wynnpage Plaza North, Lot IR, Block B, Replat and Lots 2 and 3, Block B,
Final Plat, to allow the reconfiguration of a fire lane and mutual access
easement on Lot 1 R, containing .68 of an acre of property, the developmem of
an approximate 16,000-square-foot two-story building on Lot 2, containing
1.10 acres of property, and an approximate 3,500-square-foot one-story office
building on Lot 3, containing 1.13 acres of property located along the west side
of Demon Tap Road, approximately 180 feet north of Wynnpage Drive, at the
request of Greg Yancey.
STAFF REP.: Matt Steer PROJECT ID# FP-05-0046
DRC DA TE: September 29, 2005 and October 6, 2005
CONTACT: Kenneth M.
COMMENT STATUS:
i~fn, P.E., Dir. o[ En~ineerin~/Public Works 972/304-3686
v'PRELIMINARY ~ ~
1. All utilities that cross property lines should be located within private utility easements.
2. Provide a Property Association Agreement between Lots 1R, 2 and 3, Block B for the
maintenance of the shared utilities. The agreement should include maintenance of the
lift station.
3. The portion of the service line that provides water to Lot 2 and is located on Lot 3
should be located within a private utility easement.
4. Locate the fire hydrant and FDC currently shown on Lot 2 to the parking island
located on the east side of the 24' x 29.5' Access Easement. These should be placed
within a private utility easement.
5. What is the intent of providing a water stub to the property to the north?
6. Flows to the north from the proposed flume should not be concentrated when they enter
the adjacent property. Drainage will be further evaluated upon detailed Engineering
Review.
Additional comments may be generated upon detailed Engineering Review.