Loading...
ST9302-CS 990926From: To: Date: Subject: JOHN MAGGIORE <jnmaggiore@mymail.net> "kgriffin@ci.coppell.tx.us" <kgriffin@ci.coppell.t... 9/26/99 9:56AM Sandy Lake Road Construction Ken: Ed Bell Construction started work in front of my house at 7:00 a.m. Saturday morning. Not only were they working they were busting concrete with the a backhoe using the back of the bucket which lierally shook our house to the point where my mother and mother-in-law (in town for Town Center's Grandparents Day) woke up wondering if the house was falling down. I stopped the backhoe operator and call the police. I think the City is being pretty insensitive about the way they are letting Ed Bell progress at the expense of the citizens. Starting on Saturday before 8:00 a.m., not sawcutting concrete but using a backhoe to bust it up. No dust control. No procedure for making sure the remaining trees will survive. Leaving spoils hanging around too long. No Stan Phillips any more. Gareth already has his hands full with construction issues-he surely doesn't have time to look after Sandy Lake. This is all of our City. Sandy Lake improvements could become the image of our City. Just because Ed Bell's crews don't live along this route doesn't mean they should have the right to do whatever they want...and however they want to do it. Please don't give me "you-knew-it-would-be-bad speech". You and I both know it could be better. Call me Monday at (972) 866-9555.