Loading...
ST8402-AG 890228Rev,: Effective 1/20/88 AGENDA REQUEST FORM FOR CITY COUNCIL MEETING: _Felm~m-7~89 REF/FILE NUMBER : 379 I. / II. ITEM CAPTION : Discussion and q~sideration of Order (Change Order No. 2) for adding three additiorfal median ppenings additional , left turn lanes,~o~P~n~on *a~ ~oa~ I~rovements ~o~ Sandy l~e .R~ad to ~enton~,C~r~%k as requested by ~rA~a~ h~:elrl~p~;:c~:o~s, o~i::s:]a~De~e~ ~,es) reduced Xerog p p ~ .. !. ~ ~'~[i ii! : ~:'~ .... · III. ACTION RECO~MENDED Staff recommends approva contingent on receipt of financial committments from the adjacent property owners within S working days after City Council approval. IV. REP. IN ATTENDANCE A: STAFF - Russell Doyle, P.E., City Engineer B: OTHER - Ginn, Inc. V. NOTIFICATION TO : VI. METHOD OF CONTACT : DATE : FINANCIAL REVIE~ : 1. BUDGETED ITEM : Xx YES NO 2. BUDGET AMOUNT : ~1~803~363.03 * 3. ESTIMATED AMOUNT FOR THIS ITEM : ~47~773.30 4. AMOUNT OVER~ BUDGET : g~5~899.33 (N~t~t~.) 5. LOW BIDDER RECOMMENDED : N/A YES N/A NO SOURCE OF FUNDING CO'S OR BONDS FUNDS (Series or year authorized) OPERATING BUDGET (Account Number) OTHER (Ctzreat C~tract Price b $1,789~363.03 as m t~e attached ~ Onier). APPROVED BY CITY MANAGER : City of Coppell CO.'s : Dallas County Bond F~nds .... : 1987 (Coppell); 1985 (Dallas Co.) ITEM N~MBER AGENDA REQUEST FORM SUPPORT DOCUHENTATION S[~ItlTTED HEMORANDb~S ............. LETTERS ................. REPORTS ................. BILLS ................... CONTRAcT/AGREEHENT ...... HINUTES ................. ORDINANCE ............... RESOLUTION .............. PROCLAHATION ...................... ZONING PLAI/S ...................... PRELIHINAR¥ PLATS ................. FINAL PLATS ....................... SITE PLA~S ........................ LANDSCAPE PLA~S ................... ARCHITECTURAL RENDERINGS OTHER REVIEWED BY (I[ applicable) CITY ATTORNEY ..................... FINANCE DIRECTOR .................. OTHER SUBMITTED BY DEPARTHENT DEPARTHENT DIRECTOR ............... APPROVED BY CITY MANAGER ANOGNT PE~/S~ DENIED BY NO. OF PAGES SIGNATURE SIGNATURE IGNATURE S I(NATURE ;~ CITY HANAGER ...................... : DATE SUBNXTTED DATE REVI~E1) DATE SUBHITTED DATE APPROVED Mditiomal N~*d for furth,r Submitted *ftmr At the request of February 6, 1989 MEMORANDUM 17 X ./ TO: FROM: RE: Alan D. Ratliff, City Manager Russell R. DOy~.E., City Engineer REQUESTS FOR MEDIAN CUTS AND LEFT TURN LANES ON DENTON - CIP - SANDY LAKE ROAD TO DENTON CREEK TAP ROAD In response to requests from property owners along Denton Tap Road, we have prepared a change order for installing both median openings and left turn lanes at the total expense of those requesting the work, including the construction costs, engineering, testing and inspection. The summary of costs and how they will be shared between ABQ Development Company and Univest Development Company, the property owners, is attached. We have commitment letters on file and these two property owners have been directed to submit their funds within five (5) working days of the approval of this change order by the City Council. This action will accomodate the requests of these two property owners, and in no way obligates the City of Coppell to limit land use or traffic planning around these requested median openings. Having the City's Contractor do this work, now provides a most efficient and cost effective way of getting this work done with the C.I.P. Project, and not have to interrupt and detour traffic at a later date, when the six (6) lane thoroughfare is open to traffic. The location of the median openings and left turn lanes are as follows: Station 178 + 17.77 (Part of Project Design) Location of the High School construction Site Haul Road, identified as Lot 2 of the Coppell High School Addition Plat, and the location of Coppell Plaza Drive. The main access for the Coppell Health Care Center. Station 182 + 44 (New Opening) Unidentified location just north of an existing drive on the west side of Denton Tap Road. Station 186 + 98 (New Opening) Location of existing drive just across from Town Center on the west side of Denton Tap Road. Station 195 + 28 (New Opening) MEDOPEN A desired optimum location selected by ABQ Development for their properties on both sides of Denton Tap Road, north of Parkway Boulevard. (lnslructions on reverse side) CllANGE ORI)ER No. 2 PROJECT: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek OWNER: City of Coppel! (Name, P.0. BOX 478 Address)Coppell, TX 75019 DATE OF ISSUANCE: January 27, 1989 CON'FRACTOR: L.H. Lacy' CO. OWNER's Project No. P.O. Box S41297 Dallas, TX 75354-1297 ENGINEER: Ginn~ Inc. 17103 Preston Road. Suite 100 CONTRACT [:OR: Denton Tap Road Improvements Dallas, TX 75248 from Sandy Lake Road to Denton Creek ENGINEER's Project No. ~7.cl You are directed Io make thc following changes in the Contract Documenls. Construct: qedian openings at stations 182+44, 186+98 and 195+28; northbound left-turn lanes with the median openinfs at Descriptio.: stations 182+44, 186+98 and 195+28; southbound left-turn lanes with the median openings at stations 178+17.77 and 195+98; and the west turnout for Parkway Blvd.; all in accordance with the drawings in the ~ttached Drawing List and the S~ecifications. Purpose of Change Order: To provide access to planned developments on the adjacent properties. Attachments: (List documents snpporting change) 1) 2) CItANGE IN CONTRACT PRICE: Original Conlract Price S 1: 789: 3;63_ 03 (estimated) Previous Change Orders No. 1 to No. and Field Changes No. 1 to No. S $ 2~126.05 (estimated) Contract Price prior to Ihis Change Order $1,791,489.06 (estimated) Net lucrcase (~lSl4;;Xgg~O of this Change Order $ 47,775.30 (estimated) Contract Price with all approved Change Orders $ 1,839,262.36 (estimated) Estimated Costs of Construction Drawing List Tran~mittml lettar for drawings i~nnd to Contractor on 1/17/89 CllANGE IN CONTRACT TIME: Origimd Contract Time 365 calendar days Net change I'rom previous Change Orders Contract Time Prior to this Change Order ~65 calendar days Net Increase (decrease) of this Change Order Contract l'ime wilh alt approved Change Orders RECOMMENDED: APPROVED: APPROVED: by by by EJCDC No. 19111-8-11 (1983 Edilion) SUH#ARY AND DISTRIBUTION OF CONSTRUCTION COSTS: NEDIAN OPENINGS: STATION 182+44 STATION 186'98 STATION 195-28 SUBTOTAL NEDIAN OPENTNGS LEFT TURN LARES: STATIOU 178'17.77 STATIOR 182'4& STATION 186'98 STATION 195.28 RORTH BOUND STAT?ON 195.58 SOUTH BOUND SUBTOTAL LEFT TURR LARES ABQ DEV. UNIVEST DEV. TOTAL $2,747.35 S2,747.32 S5,494.63 $2,747~32 S2,7~7.32 S5,49~.63 S3,755.61 SO.O0 S3,755.61 B9,550.24 S5,494.63 B14,744.87 SO.O0 B2,103.17 S2,103.17 $3,817.41 $0.00 S3,817.41 B3,817.41 S0.00 S3,617.41 S3,451.40 S0.00 S3,451.40 S3,035.14 $0.00 S3,035.14 S14,118.36 S2,103.17 B16,521.54 TOTAL ESTZNATED CORSTRUCTION COST S53,368.60 $7,597.80 S30,966.40 ENGINEERING, TESTIRG AND IHSPECTIOH ~ IOZ $2,336.86 S759.78 S3,096.64 GRAND TOTAL S55,705.46 S8,357.58 $34,063.04 DENTON TAP ROAD IMPROVEMENTS from SANDY LAKE RD. to DENTON CREEK ESTI#ATED COST OF ABQ DEV. AND UNIVEST DEV. REQUESTED MEDIAN OPENING AMD LEFT TURN LAMES 1 - 25 - 1989 CHANGE ORDER NO. 2 STAT/OR 178+17.77 - SOUTHBOUND LEFT TURN LANE FOR UNIVEST DEV. (100' STORAGE) ZTEM I DESCRIPTION I UTS I QUANTITY I UNZT PRICE I AMOUNT BASE BID 6 LANE PAVEMENT I 110 160 164 260 264 26~.1 360.1 360.2 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation ICY PLace Topsoil * Median (6" thick) IsY Broadcast Seeding (Common Berm) IsY Lime treatment, mat. in place IsY Lime slurry, Ty A., 55 22.5 #/ay pON Lime slurry, Ty A., 5X 34 #/sy (9" Thick) pON 8#conc. pavement 3000 psi 16" MonoLithic Curb (3000 psi) ILF 6" conc. (Driveways & Nedien Noses) lay 6"x6" JiggLe Bar (refl.)(Type 1-C) lEA 4" Traffic Button, Uhite(Non-Reft.)(P-7-g) lEA 4" Traffic Button, Uhite(sing.-Refl.)(P-15-W) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (aCh. 40) ILF 4" PVC conduit (ach. 40) ILF Puliboxes ~EA. 29.9 -147.09 -147.09 179.48 0 3.05 179.41 15.14 -32.31 10 0 0 -14.48 -7.24 -7.24 0 S6.60 SO.50 S0.42 S1.05 $67.00 S63.00 S13.68 S1.00 $24.00 S5.00 S2.00 $6.00 S2.40 S3.00 $3.73 S127.00 $197.34 (S73.55) ($61.78) S188.45 $0.00 $192.15 $2,454.33 $15.14 (S775.44) $50.00 S0.00 SO.O0 (S34.75) (S21.72) (S27.01) SO.O0 SUBTOTAL S~,103.17 STATION 182+44 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. XTE. I OESCRZPTION I UTS I QUANTITY I UNiT PRXCE I AMOUNT I EASE BiO 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roaduay Excavation ICY PLace Topsoil - Median (6" thick) ISY Broadcast Seeding (Common Berm) lay Lima treatment, met. in place [SY Lima slurry, Ty A., 5% 22.5 #/ay ITON Lime slurry, Ty A., 5X 34 #/ay (9" Thick) ITON 8" conc. pavement 3000 psi ISY 6" Monolithic Curb (3000 psi) ILF 6" conc. (Oriveweys & Median Moses) ISY 6"x6" Jiggle Bar (refL.)(Type 1-C) lEA 4" Traffic Button, UhiteCNon-RefL.)(P-7-W) lEA 4" Traffic Button, ghite(sing.-RefL.)(P-15-W) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (Sch. 40) ILF 4'* PVC conduit (Sch. 40) ILF Puliboxee lEA 28.53 -239.79 -239.79 167.87 0 2.85 181.2 -179.84 58.57 0 -16 -16 119 119 119 $6.60 $0.50 $1.05 S67.00 $63.00 S13.68 S1.00 S24.00 $5.00 S2.00 $6.00 S2.40 S3.00 S3.73 $127.00 S188.30 (S119.90) ($100.71) $176.26 S0.00 $179.55 $2,478.82 (S179.84) $1,405.68 $0.00 ($32.00) (s96.oo) S285.60 $357.00 $443.87 $508.00 SUBTOTAL S5,494.63 STATZON 182+&& - NORTHBOUND LEFT TURN LANE FOR ABG DEV. (1000 STORAGE) ITEM I OESCRZPTION I UTS I QUANTITY BASE BID 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 530.1 672 676.1 676.2 618.1 618.2 618.3 RoedNay Excavation IcY PLace Topsoil - Median (6" thick) Broadcast Seeding (Common Berm) ISY Limo treatment, met. in place ISY Lime slurry, Ty A., 5X 22.5 #/sy {TON Lime slurry, Ty A., 5X 3~ #/ay (9" Thick) ITOB 8" conc. pavement 3000 psi 6" MonoLithic Curb (3000 psi) 6N COnt. (Drivewly$ & Median Noses) ISY 6"x6" JiggLe Bar (refL.)CType 1-C) lEA ~H Traffic Sutton, Uhite(Non-RefL,)CP-7-~) lEA ~" Traffic Sutton, ~hite(aing.-RefL.)CP-15-u) lEA 2" PVC conduit (ach. &O) ILF 3N PVC conduit (ach. 40) &" PVC conduit (Sch. &O) ILF PuLIboxes lEA 33.&& -226.87 -226.87 200.68 0 3.~1 200.61 -&~.? 26.26 10 0 0 0 0 0 0 UNIT PRICE I AMOUNT I $6.60 S220.70 $0.50 S0.~2 ($95.29) $1.05 $210.71 $67.00 $0.00 S63.00 S214.83 S13.68 S2,744.34 $1.00 ($44.70) S24.00 $630.2& $5.00 $50.00 S2.00 S0.00 S6.00 S0.00 S2.&0 S0.00 $3.00 $0.00 $3.73 S0.00 $127.00 $0.00 SUBTOTAL S3,817.~1 STATION 186+98 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM } DESCRIPTION IBASE BID 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 530.1 672 676.1 676.2 618.1 618.2 618.3 62& {Roadway Excavation IcY IPLace TopsoiL - Median (6" thick) {BY {Broadcast Seeding (Common Berm) IsY Lime treatment, met. in pLace ~SY Lime sLurry, Ty A., 5~ 22.5 J/ay ITOH Lime slurry, Ty A., 5X 34 J/ay (9" Thick) ITOH 8" conc. pavement 3000 psi lay 6" MonoLithic Curb (3000 psi) JLF 6" cant. (Driveways & Nedfan Noses) ISY 6"x6" JiggLe Bar (refL.)(Type 1-C) lEA 4" Traffic Button, ~hite(Non-RefL.)(P-7-~) lEA 4" Traffic Button, Vhite(sing.-Refi.)(P-15-u) lEA 2" PVC conduit (ach. 40) {LF 3" PVC conduit (ach. 40) ILF 4" PVC conduit (ach. 40) ILF PuLLboxes IEA 28.53 -239.79 -239.79 167.87 0 2.85 181.2 -179.8/* 58.57 0 -16 -16 119 119 119 & $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 S24.00 $5.00 $2.00 S6.00 $2.40 $3.00 $127.00 $188.30 ($119.90) ($100.71) $176.26 $0.00 $179.55 S2,&78.82 ($179.84) Sl,405.68 S0.00 (S32.00) ($96.00) $285.60 S357.00 $443.87 S508.00 SUBTOTAL S5,494.63 STATION 186+98 - NORTHBOUND LEFT TURN LANE FOR ABa DEV. (100' STORAGE) LTEM I DESCRIPTION I UTS I GUA#TiT¥ BASE BiD 6 LANE PAVEMENT 110 160 16& 260 264 264.1 360.1 360.2 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation IcY PLace Topsoil * Median (6" thick) IsY Broadcast Seeding (commn Berm) IsY Lime treatment, met. in place IsY Lime slurry, Ty A., 5X 22.5 #/sy ITON Lime slurry, Ty A., 5Z 34 #/By C9" Thick) JTON 8" conc. pavement 3000 psi IsY 6" MonoLithic Curb (3000 psi) ILF 6" conc. (Driveways & Median Noses) ISY 6"x6" JiggLe Bar (refL.)CType 1-C) lEA 4" Traffic Button, ghtteCNon-Refi.)CP-7-W) lEA &" Traffic Button, ghiteCstng.-RefL.)(P-15-W) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit CSch. 40) ILF 4" PVC conduit (Sch. 40) ILF PuLLboxes lEA 33.44 -226.87 -226.87 200.68 0 3.41 200.61 26.26 10 0 0 0 0 0 0 SUBTOTAL STATION 195+28 NEDIAN OPENING ,~L~ XTEN I DESCRIPTION I UTS I GUANTZTY BASE BID 6 LANE PAVENENT I 110 160 16~ 260 264 264.1 360.1 560.2 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation IcY PLace Topsoil - Median (6" thick) IsY Broadcast Seeding (Common Berm) IsY Lime treatment, mat. in place IsY Lime slurry, Ty A., 5X 22.5 #/sy ITON Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) ITO# 8" conc. pavement 3000 psi IsY 6" MonoLithic Curb (3000 psi) ILF 6" conc. (Driveways & Median Noses) ISY 6"x6" JiggLe Bet (refL.)(Type 1-C) lEA 4" Traffic Button, ~hiteCNon-RefL.)(P-7-~) lEA 4N Traffic Button, VhiteCsing.-RefL.)CP-15-~) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (Sch. 40) ILF &" PVC conduit (Sch. 40) ILF PuiLboxes lEA 26.67 -160 -160 1&6.67 1.65 0 160 -120 0 0 -16 -16 111 111 111 I UNiT PRICE I AMOUNT I S6.60 S220.70 S0.50 (S113.44) S0.42 (S95.29) $1.05 SZ10.71 $67.00 SO.O0 S63.00 $214.83 S13.68 S1.00 S24.00 S630.24 S5.00 S50.00 S2.00 $0.00 $6.00 $0.00 52.40 $0.00 $3.00 S0.00 $3.73 $0.00 $127.00 $0.00 $3,817.41 I UNIT PRICE I AMOUNT I S6.60 S176.02 $0.50 ($80.00) S0.42 (S67.20) $1.05 S154.00 $67.00 S110.55 $63.00 SO.O0 S13.68 S2,188.80 $1.00 (S120.00) S24.00 $0.00 $5.00 S0.00 S2.00 ($32.00) S6.00 (S96.00) S2.40 SZ66.&O $3.00 S333.00 S3.73 S&14.03 $127.00 S508.00 SUBTOTAL S3,755.61 STATION 195+28 NORTHBOUND LEFT TURN LANE (80' STORAGE) ITEN I DESCRiPTiON I UTS I QUANTITY 110 160 16& 260 264 264.1 360.1 360.2 530.1 672 676.1 676.2 618.1 618.2 618.3 624 BASE BID 6 LANE PAVEMENT Roaduay Excavation PLace Topsoil - Hedian~(6' thick) Broadcast Seeding (Common Berm) Lime treatment, mat. in place Lime slurry, Ty A., 5X 22.5 #/ay Lime slurry, Ty A., 5~ 34 #/sy (9# Thick) 8" cone. pavement 3000 psi 6" #onottthtc Curb (3000 psi) 6" coflc. (Driveways & Median Noses) 6"x6" Jiggle Bar (refi.)(Type 1-C) 4" Traffic Button, white(Hon-Refl.)(P-7-U) 4" Traffic Button, white(sing.-Reft.)(P-15-W) 2" PVC conduit (Sch. 40) 3" PVC conduit (ach. 40) 4" PVC conduit (ach. 40) Puitboxea I ICY 29.74 IsY -204.65 ISY -204,65 laY 178.46 ITOH 0 ITON 3.03 lay 178.38 ILF -45.36 IsY 26.26 lEA 8 lEA 0 lEA 0 ILF 0 ILF 0 ILF 0 lEA 0 UNIT PRICE I AMOUNT S6.60 $196.28 $0.50 ($102.33) S0.42 ($85.95) $1.05 $187.38 S67.00 S0.00 S63.00 S190.89 S13.68 S2,440.24 $1.00 (S45.36){ S24.00 $630.24 $5.00 S40.00 S2.00 S0.00 $6.00 S0.00 S2.40 S0.00 S3.00 S0.00 S3.73 $0.00 $127.00 $0.00 SUBTOTAL S3,451.40 STATION 195+28 SOUTHBOUND LEFT TURN LANE (100' STORAGE) ITEM I DESCRIPTION I UTS BASE BID 6 LANE PAVEMENT I 110 160 164 260 264 264.1 360.1 360.2 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation ICY Place Topsoil - Median (6" thick) ISY Broadcast Seeding (Common Berm) IsY Lime treatment, mat. in place ISY Lime slurry, Ty A., 5X 22.5 #/sy ITOH Lime slurry, Ty A., 5X 34 #/sy (9" Thick) lION 8" conc. pavement 3000 psi IsY 16" Monolithic Curb (3000 psi) ILF I 6" conc. (Driveways & Median Moses) IsY 16"x6H Jiggle Bar (refL.)CType 1-C) lEA I 4" Traffic Button, UhiteCNon-RefL.)(P-7-g) lEA 14" Traffic Button, ~hite(sinR.-RefL.)(P-15-~) lEA I 2" PVC conduit (ach. 40) ILF 13. PVC conduit (ach. 40) ILF I 4" PVC conduit (ach. 40) ILF IPuLiboxes {EA 25.76 - 180.84 - 180.84 154.65 1.74 0 154.58 -45.36 26.26 10 0 0 0 0 O O S6.60 $0.50 $0.42 S1.05 S67.00 S63.00 S13.68 S1.00 S24.00 S5.00 S2.00 S6.00 $2.40 $3.00 $3.73 S127.00 S170.02 (S90.42) (S75.95) S162.38 S116.58 S0.00 S2,114.65 (S45.36) S630.24 S50.00 $0.00 S0.00 $0.00 $0.00 $0.00 S0.00 SUBTOTAL S3,032.14 ESTZ#ATED COST OF ADDiTiON OF WEST SiDE TURNOUT AT THE DENTON TAP RD./PARKUAY BLVD iNTERSECTiON LTE# I DESCRIPTION I UTS I QUANTLTY ] UNIT PRICE I AMOUNT lO0 110 131 133 260 264.1 360.2 360.3 360.& 530.1 530.2 530.3 618.2 624 666.1 BASE BZD 6 LANE PAVEMENT IPrepare R.O.U. Roadway Excavation Borrow (Detfv.)(d.c.),Type B, CL.3 Remove/RepLace unstable material Lime treatment, mat. in place Lime slurry, Ty A., 5X 34 #/ay (9" Thick) 16" #onoLtthLc Curb (3000 psi) IConcrete street header 18# Conc. Pavement Int. Streets I 6" cone. (Oriveweys & Median Noses) IBrfck pavers (Uni-Oecor) IBrtck pavers (HoLLand I) I 3. PVC conduit (ach. 40) IPuLiboxea 118" Stop Bar I ISTA O.J~' ICY 0 ICY 0 ICY 0 ISY 385 ITON 6.6 ILF 60 ISY 370 IsY 17 IsY 168 IsY 17 ILF 898 lEA 10 ILF 34 S4,051.00 Sl,417.85 S6.60 S0.00 S0.10 20.00 S5.00 $0.00 21.05 S40&.25 S63.00 $415.80 $1.00 $42.00 $3.00 S180.00 S16.00 $5,920.00 $24.00 $408.00 $21.00 S3,528.00 S21.00 $357.00 S3.00 $2,694.00 S127.00 $1,270.00 $5.00 $170.00 SUBTOTAL S16,806.90 Sheet ~0. 13 14 15 16 17 24 25 26 27 28 DI~AWZNG LZBT DENTON TAP ROAD ZMPROVE~ENTB FROM BA~DY L~KE ROAD TO DENTON CREEK CHANGE ORDER NO. 2 ~- Description Sheet Index and St~mmary of Quantities Paving Sta. Paving Sta. Paving Sta. Paving sta. Paving Sta. Drainage Sta. Drainage Sta. Drainage Sta. Drainage Sta. Drainage Sta. 174+00 to 179+00 179+00 to 184+00 184+00 to 189+00 189+00 to 194+00 194+00 to 199+00 174+00 to 179+00 179+00 to 184+00 184+00 to 189+00 189+00 to 194+00 194+00 to 199+00 Revision No. 5 3 2 3 4 4 4 3 4 5 6 GINN, INC. CONSULTING ENGINEERS November 9, 1988 Mr. Russell Doyle, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Improvements Creek from Sandy Lake Road to Denton - ABQ Median Opening Request Dear Mr. Doyle: This letter is in response to your letter concerning the above. The design of the requested median opening north of Parkway Blvd. can be included in the scope of our work covering overall design of the project, and therefore you will not have to go through the work authorization process. The procedure for accomplishing this is as follows: me Obtain a letter of Financial Commitment from ABQ Development Company stating that they will pay for the Engineering, Testing, Inspection, and Construction of the Median Opening. This letter should state that they will deposit the funds with the City within 5 days after the city Council approves a Change Order covering the construction of the Median Opening. e Upon receipt of the above letter of Financial Commitment, you can authorize Ginn, Inc. to prepare a Change Order for City Council consideration. We have enclosed cost estimates for the Change Order and additional engineering costs. We are prepared to seek the Contractor's approval of the necessary Change Order, and revise the drawings accordingly upon receipt of your authorization. We have also enclosed a letter of response for your signature on City of Coppell letterhead to Jerry Parche' Consulting Engineers which covers the above. Please call me if you have any questions. Si e y, , H. Wayne Gi~n, P.E. enclosures cc: John C. Karlsruher, P.E. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 TO GINN, INC. Consulting Engineers 17103 Preston Road Suite 100, LB-l]8 DALLAS, TEXAS 75248 (214) 248-4900 ? / WE ARE SENDING YOU /Attached [] Shop drawings [] Copy of Fetter [] Prints [] Change order [] Plans [] Samples DESCRIPTION THESE ARE TRANSMiTFED as checked below: [] For approval For your use As requested [] For review and COmment [] FOR BIDS DUE [] Approved as submitted [] Approved as noted [] Returned for corrections [] Resubmit... [] Submit [] Return COpies for approval COpies for distribution COrrected prints 19 [] PRINTS RETURNED AFTER LOAN TO US