ST8402-CS 901206 The City With A Beautiful Future December 6, 1990 Mr. Gabe Favre, P.E. this project could not be finalized and accepted by City Council during the December 11, 1990 meeting unless all items identified on the punch list were complete and documentation received by November 29, 1990. Parks and recreation staff have continued to monitor the work performed on this project and find that several items remain incomplete. This includes repair items on Postal Service property identified and documented in Ms. Llnda A. Smith's correspondence to Ginn, Inc., dated November 15, 1990. Attached, you will find items that staff feels need to be corrected by the contractor. Staff recognizes that this is a partial compilation only, and that Mr. J.R. Richards or you would make an official list once a final walk through has been made. P.O, Box 478 CoppelI, Texas 75019 214-462-0022 FAX 214- 393-0948 As we had discussed, it would be in everyone's best interest that this project be completed by January 1, 1991. The next opportunity to have this project accepted by the City Council would be during the January 8, 1991 meeting. In order to allow this to occur,-all work needs to be completed, final walk throughs done and documentation received no later than December 27, 1990. This will allow for necessary time to have staff examine the project for agenda submittal. Should you have any questions concerning this project, please feel free to contact me at any time. Thank you for your time, consideration and reply in this matter. Rick S. Wieland Parks and Recreation Manager CC.* Steven G. Goram, Director of Public Works John C. Karlsruher, P.E., Ginn, Inc. Linda A. Smith, ASLA, Natural Design Concepts, Inc. Denton Tap Road Landscapinq General Notes: (December 4, 1990) Valve boxes should be adjusted to lawn grade as specified in the irrigation specifications (Detail sheet D-l) Regrade and correctly position electric boxes where needed to Street Superintendent's approval. Additional fill needs to be added to those areas where dirt has been added to trench and bore hole. One example would be the median Just south of the Cottonwood Bridge where additional fill dirt needs to be brought in for the entire width of the median. The irrigation controller located on Island XII needs to be leveled. There are numerous ruts and low areas that need to be filled. Trees 1. 2. 3. remaining to be replaced~ Cedar Elm by utility pole %28 on Island XI. Three (3) Eves Necklace on Islands II, III, and XV. One (1) Red Crapemyrtle located at Denton Tap Road and Sandy Lake Road. 4. Two (2) Roughleaf Dogwoods between utility poles %34 and %35 on Island XII. 5. Plant one (1) Bigtooth Maple between Station 125 and Station 130. 6. Plant two (2) Carolina Buckthorn between Station 136 and Station 140. A total of four were indicated on the plans. 7. Replace multi-trunk Red Bud located on Island XII. Postal Service Facility (December 4, 1990) All comments relating to work to be performed are addressed in Linde A. Smiths correspondence of November 15, 1990. At the date indicated above, no visible work has been performed.