Loading...
ST8402-CS 900329GINN, INC. DATE: MEMO TO: FROM: RE: end CONSULTING ENGINEERS March 29, 1990 Landscape Design and Construction, 2559 Southwell Road ~ln~TS ,in~Xas 75229 ~.~/~..~ F o. Identification of Of£ioial Representatives of Owner, other interested agencies= Engineer, City of Coppell P.O. Box 478 Coppell, Texas 76019 (214) 462-0022 Alan Ratliff, city Manager Steve Goram, Director of Public Works Richard Diano, Director of Parks Engineer= Ginn, Inc. Consulting Engineers 17103 Preston Road, suite 100 Dallas, Texas 75248 (214) 248-4900 Gabe Favre, Project Manager J.R. Richardson, Project Field Representative John Karlsruher, Project Engineer Linda Smith, Landscape Architect ~ Contr&otor= Landscape Design and Construction, 2559 Southwell Road Dallas, Texas 75229 214-247-3121 Clyde St. John Jerry Williams Alvino Valdiviez Inc. 2. Responsibilities of Engineer: -does not "supervise" the contractor's or operations. employees, equipment 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 DENTON TAP ROAD LANDSCAPING - PRECONSTRUCTION CONFERENCE -will not dictate or advise as to means or methods of "Work" or safety regulations during the project...contractor expected to comply with all codes and safety practices related to this type of construction. -Ginn,Inc. will administer project, make field observations, review shop drawings, review and make recommendations to city on pay applications, provide all correspondence for project, make determinations on plans and specifications as required, act as representative of the City of Coppell. 3. Responsibilities of Owner: -abide by owner/contractor agreement -make payments based upon Engineer's recommendations -review and approve change orders, if applicable -does not have authority to makes changes in work without going through proper channels. first 4. Responsibilities of Contractor: -reviewed owner/contractor agreement, be familiar with it -reviewed plans and specs/contract documents -have an understanding of the work to be completed S. Responsibilities of any other agency contributing to the projects -other utilities are involved...but have no jurisdiction regarding this contract...need to cooperate with them in locating their facilities and being careful not to destroy them. 6. Notice to Proceed: -notice to proceed is given as on or before April 2,1990. -contract is 120 calendar days -completion date is therefore July 31, 1990. -alternate no. 3,4 and 5 are not part of this contract. DENTON TAP ROAD LANDSCAPING - PRECONSTRUCTION CONFERENCE 7. Liquidated damages: -liquidated damages are $150.00 per calendar day beyond contract completion dater 8. Requests for extension of contract time~ -will not be considered at the beginning of the project -will not be considered unless proper justification is provided -will have to be approved by the city Council as a change order -will have to be made in accordance with the contract documents 9. Procedures for making partial pa~nents= -refer to specs Section 00810 page 7...on or before 10th of the month...all work up to last day of previous month...all quantities must be verified with field representative prior to submitting in final form. -5% retainage on this project -will usually go on the fourth Tuesday council meeting and be paid shortly thereafter -if not in correct form, or quantities have not been verified, then it may be delayed -usually takes 1-2 days after it reaches our office -time in the field depends upon the amount of quantities and the time it takes to verify with the project representative 10. Guarantee or warranty on completed work~ -one year from date of completion and final acceptance of owner...not the date of substantial completion 11. Other requirements of the contract and specifications which deserve special discussions by all partios~ -we have 3 sets of plans .and specs for the contractor, any additional sets can be made at cost of printing DENTON TAP ROAD LANDSCAPING - PRECONSTRUCTION CONFERENCE -contractor will be paid on actual work and quantities incorporated into the work and not necessarily the exact numbers listed on the bid form...which was used for bid comparison only -work sequence must be submitted to and reviewed by the engineer prior to beginning construction -field engineering (stake out) is responsibility of contractor, -when submitting monthly pay applications...also submit monthly updated progress schedules...see specs -contractor shall submit weekly progress reports also...this is essential to the project -shop drawings...see specs for work requiring shop drawings and how to submit.,.usually takes one week turn around for review and distribution...but may take longer in some instances... -testing laboratory services...paid for by the Owner for initial testing...any re-testing will be requested and paid for separately by the contractor... -inspections...or rather resident project representative services are clearly written out in the contract documents...our people will adhere to this section of the documents as closely as possible -maintain project record drawings in accordance with the specs...as-built drawings will be prepared by the contractor... 12. Contraotor,s schedules -have contractor describe schedule in sufficient detail to enable the owner and engineer to plan their operations regarding fire, police and utility services 13. Equipment to be used by oontraotor~ -dirt hauling trucks (backfill material) concern about spilling material on existing streets are responsible for cleaning up. DENTON TAP ROAD LANDSCAFING - PRECONSTRUCTION CONFERENCE 14. Contractor,s plans for delivering materials to site: -where will you store backfill material? -where do you intend to place machinery after working hours? -work must be done between the hours of 8 a.m. and 6 p.m. 15. Subcontracts: -need names, addresses and phone numbers of subs...even though we will deal only with the general contractor 16. Schedule of materials delivery: -not addressed at this meeting 17. Change orders: -any work not shown on the plans or specs and requiring addition or deletion of money or contract time will be considered only in the form of a change order... -minor field changes may be made...with consent of engineer and contractor as long as it does not require a change order or involves money. 18. Staking of work: -contractor must stake out all components of the project 19. -the please check with permit department. -final acceptance and approval of the work will be with the specs... 20. Labor requirements: -there is a prevailing wage scale rate on this project Project inspection ~nd final acceptance of work: owner may require other inspections...when you get permit, in accordance DENTON TAP ROAD LANDSCAF£NG - PRECONSTRUCTION CONFERENCE 2L. Rights-of-v&~ and etsements~ -all of the work, generally, is in the right of way of the City of Coppell...temporary construction easements may be required by the contractor, dependent u~')n equipment requirements, space etc.,and will be the responsibility of the contractor -contractor will have t¢ coordinate with the other utilities 22. Pro~eot signs~ -no project signs are required...construction responsibility of the contractor signs a~e the 23. Comments, question~ etc. -Public Works requested 24 hours notice when notice for shutdowns occurs so that they may coordinate with homeowners...also requested that they tu~ n all valves... City requested 24 hour notice also. -Richard Diano reminded the contractor that there is specified four cuttings of the turfgrass as part of the project. -locate valves on the plans with references to permanent fixtures -Howard Pafford request'%d that contractor give 24 hours notice with regards to water tine relocations and locating, including the fire hydrant leads, water services, double check valves in the parkway etc. -contractor is to remove the existing PVC leads from the fire hydrants and replace wit!% copper...it is in the specs. -meters can be received from Pafford -Pafford and his people '~ill provide inspection of the meters -make sure gravel is in the bottom of the meter boxes -Linda Smith requested that contractor keep up with subs daily on the as-built drawings -plant material sources...resubmit list DENTON TAP ROAD LANDSCAPJNG - PRECONSTRUCTION CONFERENCE -on the B & B material Linda wants to see a typical and will approve...or take a field a field trip to the nursery -since there was recent freeze damage to plants in area...wait on crepe myrtles, as requested by Linda Smith Should you have any questions regarding any of the above, please do not hesitate to contact us. Please sign below and return one copy to us for our files. Sincerely, Gabe Favre cc= Steve Goram Richard Diano Howard Pafford Linda Smith John Karlsruher H. Wayne Ginn File 406-215 The above items are to be a modification Concurrence: Landscape Design and Construction, By: Title: noted and concurred with, but understood not of any existing contracts or agreements. I nc. Date: