Loading...
ST8402-CS 900322COPPELL PUBLIC March 22, 1990 Steve Goram, Director of Public Works Per Birdsall, Street Superintendent~ North Denton Tap - Shoulders Tickler 2/16/90 By my records, I show a memo was generated by me on 2/15/90 (no copy). Using virgin materials for the base, the County estimates that with 100' cue space in the turn lanes and the 250' reverse curve standard it would cost $17,827.20 for the total project. The County could provide. 50% of the cost ($8915.60), which could be reduced dramatically by utilizing "black base" which consists of recycled asphalt with the addition of "Gator Gold", an asphalt rejuvenate. This would bring the County/City 50% cost down to $5,865.00, since the County would be matching our funds, I would recoa~end the utilization of any balance left from the recent overlays to accomplish this if sufficient funds remain. PHB / bb SHOULDER.PHB