ST8402-CS 900307 GINN, INC. March 7, 1990 CONSULTING ENGINEERS Mr. H. Lacy Company ~ P. O. Box 541297 ~ Dallas, Texas 75354-1297 Re: Denton Tap Road Impro~ nts from Sandy Lake Road to Denton Creek - Final Punch List ~ Dear Mr. Balch: / mitting herewith the final punch lists de~e~ our final~~nns of the project over~le ~f weeks. Included with the punch list items noted by myself in your presence are the items noted by the City personnel which have been left in the punch list form in which I received them. There may be some redundancies in the lists. Please correct the items indicated on each list. Item No. 21 on page 4 is to be included as a part of Field Change No. 6, as noted and its cost must be included in your Final Application for Payment. All other items will be accomplished at L. H. Lacy Co.'s expense in accordance with the Contract. Once you have completed work on these items please call me in order that we may be able to verify compliance as soon as possible without unduly delaying final acceptance of the project. Call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer enclosures cc: H. Wayne Ginn, P.E. Howard Pafford - w/enclosure Richard Diano - w/enclosure Dana Kamp - w/enclosure J. R. Richardson - w/enclosure 17103 Preston Road ~' Suite 100 · LB Il8 · Dallas, Texas 75248 · Phone 214/248-4900 FINAL INSPECTION PUNCH LIST PROJECT: Denton Tap Road improvements from sandy Lake Road to Denton Creek, Coppell, Texas DATE OF FINAL iNSPECTION: February 23, 1990 cit of Coppell street Dept. Dana Kamp, ~¥ ....... il Street Dept. ATTENDEES: Brent Adams, city o~ ~v~ J. R. Richardson, Ginn, In~ Inc John C. Karlsruher, P.E., Glnn, · scott Balch, P.E., L. H. Lacy Company North bound lanes from sand~ Lake Road to Denton Creek: 1. Beginning of project, station 166+58, inside lane curb on pre-existing section is cracked- Repair crack. 11 box Sta. 166+60 needs to be reset to grade. slo es from Sta. 166+58 .to 2. Pu rivate property P. ama e and p~ovl~e 3. R.O.W. and P ~,~no ~eDair erosion d g -- ~.,~ ~o h~s approX. Sta..x-o~-i~o~'at contractor'S expen~ ~ permanent erosion COn~ use of property for unauthorized borrow source for median topsoil. 4. Inlet Sta. 167+27.75 - remove mortar slag from throat. 5. patch curb in variable height section of inlet at Sta. 167+27.75. 170+26.32 remove mortar slag 6. Inlet in left turn lane Sta. from throat. 7. North bound left turn lane at skagg'S north driveway replace jiggle bar tiles due to soft epoxy. 8. clean and seal redwood header at rear of south median nose at skagg'S north drive median opening (Sta. 170+41.32). GENEI~L NOTE FOR ENTIRE pROJECT: Clean and seal all paving joints due to sealant too low. and seal joints between 9. Median nose at Sta. 171+64 - clean the back of curb and median pavement. GENERAL NOTE FOR ENTIRE pROJECT~ clean and seal joints between the back of curb and median pavement on all median n°ses. 10. Median nose at Eta. 171+24 - same as item 9. above. 11. Clean and seal redwood header at Eta. 171+53.92- 12. Inlet at Eta. 172+76.50 - remove mortar slag from throat and ' ' r inlet. clean out lnterlo of 13. Inlet at Eta. 176+75 - remove saw blade and other 's interior. construction debrl and clean 14. Clean and seal redwood header at Sta. 177+52.85- page i North 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 90. bound lanes (continued)~ Correct drainage "bird bath" in gutter, outside lanes, approx. Sta. 177+50. Median nose at Sta. 177+80 - clean and seal joint between back of curb and median nose pavement. Traffic pull box at Sta. 178+79 - bolt hole damaged - repair or replace pull box. Inlet at Sta. 179+00 - remove construction debris from the interior of the inlet and clean interior. Inlet at Sta. 181+00.00 - remove mortar slag from throat and clean out interior of inlet. Traffic pull box at Sta. 181+88 - bolt hole damaged - repair or replace pull box. Clean and seal redwood headers at Sta. 181+91.32 and Sta. 183+03.92. Median nose at Sta. 182+74 - clean and seal joint between back of curb and median nose pavement. Inlet at Sta. 183+50 - remove construction debris from the interior of the inlet and clean interior. Repair landscape berm at the "Parks of Coppell" sign. Inlet at Sta. 185+35.23 - remove mortar slag in throat. Multiple cracks in left turn lane paving from Sta. 184+45.82 to Sta. 186+68. Traffic pull box at Sta. 186+42 - bolt hole damaged - repair or replace pull box. Median nose at Sta. 187+28 - clean and seal joint between back of curb and median nose pavement. Clean and seal redwood header at Sta. 187+57.92. North bound left turn lane at Parkway Boulevard repair holes in pavement where jiggle bar tiles were removed. GENERAL NOTE FOR ENTIRE PROJECT~ Remove all construction debris and trash from the medians. 31. Brick paver crosswalk across the north bound lanes on the south side of the Parkway Blvd./Denton Tap Rd. intersection - replace brick pavers with holes and cracks in them. 32. Brick paver crosswalk across Parkway Blvd. at east side of the intersection - pavers need more sand and the eastern concrete edge joint needs repair. Lower ~he pavers at the south edge of the crosswalk. 33. Repair the pavers in the Parkway Blvd. median at the east side of the intersection. . . 34. Redwood header at east edge of Intersection, near the north curb, needs to be repaired. 35. Correct drainage "bird bath" adjacent to wheelchair ramp radius at northeast corner of Parkway/Denton Tap. 36. Repair broken traffic buttons in the radius at the northeast corner of the Intersection. 37. Clean and seal redwood header at Sta. 191+75.68. 38. Inlet at Sta. 191+94.64 - Clean out interior and repair face of inlet. Page 2 39. Median nose at Sta. 191+53 - repair cracked curb. 40. Replace broken pull box at Sta. 191+79. 41. Patch holes in pavement where traffic buttons were removed. 42. Repair erosion damage to roadway sideslopes and remove concrete waste and trash from same. 43. Median nose at Sta. 195+58 - Clean and seal joint between back of curb and median pavement. 44. Traffic pull box at Sta. 200+00 - adjust to conform to median grade. 45. Remove concrete and stakes from the median. 46. Traffic pull box at Sta. 203+29 - bolt hole damaged - repair or replace pull box. 47. Remove temporary yellow construction detour centerline stripes at Denton Creek b~idge. South bound lanes from Denton Creek to Sandy Lake Road= 1. Clean construction trash, debris, and traffic detour barrel out of the ditch adjacent to the north end of the project. 2. Repair erosion damage on the roadway sideslopes along the Park. Remove concrete waste and trash from same. 3. Correct drainage "bird bath" in outside lane gutter at south end of inlet throat blockout Sta. 201+54.5 ±. 4. Inlet/flume at Sta. 201+60 - remove concrete waste. 5. Patch outside curb at bridge approach slab - Sta. 197+99.73. 6. Inlet at Sta. 195+50 - remove mortar slag from throat, lumber from inside of inlet, clean out interior of inlet. 7. Inlet at Sta. 192+01.96 - remove construction debris from the inside and repair crack in throat. 8. Patch curb in south end of the south variable height curb for inlet in item 6. above. 9. Correct drainage "bird bath" adjacent to wheelchair ramp at northwest corner of Parkway/Denton Tap. 10. Brick paver crosswalk across Denton Tap Road south bound lanes, north side of the Parkway Blvd. intersection - replace damaged brick pavers. 11. Median nose, Parkway Blvd. west side of the intersection - repair crack in curb. 12. Brick paver crosswalk across Parkway Blvd., west side of the intersection - needs more sand in south end of walk and wheel chair ramp. 13. Correct drainage "bird bath" adjacent to wheelchair ramp in radius at southwest corner of Parkway/Denton Tap. 14. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 189+53. 15. Inlet at Sta. 187+50 remove construction debris from the interior. 16. Correct drainage "bird bath" in outside lane gutter at north end of inlet blockout approx. Sta. 187+71 ±. 17. Inlet at Sta. 185+88.94 - remove barricades~ and construction debris from the inside of the inlet. 18. Inlet at Sta. 183+50.00 - remove plywood and construction debris from the inside of the inlet. 19. Redwood header at Sta. 181+91.32 joint edge in outside lane is in need of repair. 20. Inlet at Sta. 181+00 - remove plywood and construction debris from the interior and repair crack in the throat. 21. Complete modification of rear opening of inlet at Sta. 176+50 as part of Field Change #6 per Engineer's instructions. 22. Remove yellow temporary center stripe in south bound lanes from Sta. 171+00 south to Sandy Lake Road. 23. Repair cracked curb at south header of project (Sra. 166+58). 24. Correct drainage "bird bath" in outside lane gutter at south side of project header Sta. 166+58. Also included herein by reference are the punch lists listed es follows end attached hereto~ 1. Memorandum from Dana Kamp to John Karlsruher dated 2/26/90 2. Memorandum from Richard Diano to John Karlsruher dated 2/22/90 3. Memorandum from Howard Pafford to John Karlsruher dated 2/28/90 FINAL INSPECTION PUNCH LIST FOR COTTONWOOD BRANCH BRIDGE DATE OF FINAL INSPECTION: February 23, 1990 ATTENDEES: John C. Karlsruher, p.E., Ginn, !nc. J. R. Richardson, Ginn, Inc. Stan Reed, P.E., Reedcon, Inc. 1. Rout and seal joints and cracks in approach slabs. 2. Remove construction debris from deck slab sidewalk and median. Sweep and clean same. 3. Seal all wingwall/riprap joints. 4. Rout and seal all vertical construction joints between new and old concrete riprap slope protection. 5. Remove loose backfill around guardrail foundations, all locations, and replace with backfill compacted to 95% Standard Proctor Density. 6. Repair or replace guardrail attachment at southeast corner of bridge. 7. Bridge electrical punch list will follow under separate cover when electrical inspection is completed. FINAL INSPECTION PUNCH LIST FOR COTTONWOOD BRANCH BRIDGE LIGHTING SYSTEM DATE OF FINAL INSPECTION: March 6, 1990 ATTENDEES: John C. Karlsruher, P.E., Ginn, Inc. C.R. McCreary, P.E., C.R. McCreary & Assoc., Scott Balch, P.E., L.H. Lacy Co. Bill Brooks (sub-contractor to L.H. Lacy) Irlc. Electrical problems prevented operation of light system. Two breakers tripped, no lights came on. Contractor to work out problems and re-schedule Final Inspection. February 26, 1990 John Karleruher, Project Hanager- Oinn, Inc. Kamp, Slgnn/Signalizatlon Technictan~... Dana Walk Through Punch Lint Itemn Denton Tap North The following are the punch list items that need to be addreseedz sandy 10. 11. 12. 13. 14. Lake North to Parkway Remove old epoxy northbound right lane from first akip line to third skip line. Raise and level pull box first media~ northbound. ** Redo epoxy on button ~2 in skip line ~$ left lane epoxy did not set. Redo epoxy on buttons ~1, 3, d, in skip line ~7 right lane epoxy did not set. Redo epoxy on button ~2 in skip line ~8 right lane epoxy did not set. Redo epoxy on buttons ~1,2,3, 4 in skip line ~8 left lane epoxy did not eot. Redo epoxy on button ~3 skip line ~12 right lane epoxy did not set. Redo epoxy on buttons ~2, 3 skip line ~12 right lane epomy did not net. Redo epoxy on buttons ~, 2, 3, 4 skip line ~2 left lane epoxy did not set. Replace buttons ~I, 3 skip line ~12 left lane broken buttons. Redo epoxy on buttons ~1, 2, 3, 4 skip line ~13 left lane epoxy did not net. Redo epoxy on button ~2 nkip.line ~14 left lane epoxy did not set. Remove epoxy by button ~4 skip line ~15 right lane. Replace pull box rdmedian north end securing bolt hole broken out. Northbound Parkway to Bridge 1. Redo epoxy on first 8 buttons northbound next to right lane (edge line). 2. Replace button ~2 same loca~ion. 3. Remove old epoxy button 13 same location. Remove old epoxy button 14 same location. 5. Remove old epoxy button 15 same location. 6. Remove old epoxy button 16 same location. 7. Remove old epoxy button remains by button 113 same location. 8. Redo epoxy on first button skip line ~2 epoxy did n~ set. 9. Replace button 12 skip line 12. Broken. 10. Replace button 14 skip line ~2. Broken. 11. Replace button 123 edge line. Broken. 12. Remove epoxy between button 126 end 27 edge line. 13. Raise and level Pull box 2nd mediae (in middle) northbound. 14. Remove temporary yellow type (center line) northbound st end of project. Southbound From Bridge to Parkway 2. Hissing first reflective button skip line 17 southbound. Southbound From Parkway to Sandy Lake "* 1. Redo epoxy on buttons 12, 3, 4 os skip line #32 right lane Bet. epoxy did not Redo epoxy on button 12 skip line 128 left lane, epoxy did not eet. Redo epoxy on button 13 Bkip line ~39 left lane epoxy did not Bet. Remove temporary yellow tspe right Ieee starting at skip line 146. Remove old epoxy center lane from skip line ~56 to skip line ~59. Remove old epoxy by jiggle bars (Tara Lane) ~ Sandy Lake end Denton Tsp. If you have any questions regarding this list, please let mo know.. DFK/bb LIST3.DFK COpp~T~ ~UBL~C WORKS February 22, 1990 John Karlsruher, Project Manager- Ginn, Inc. FRO~z Richard Diane, Park Superintendent~ Denton Tap Punchlist These items require remedial action to make them acceptable to the City of Coppell~ The elopes at Andrew Brown Park and along the right-of-way of the adjacent park property need to be cleaned of construction debris by raking it out end dispoeing at offeite. It is recommended that buffalogrese eeed be broadcast on these elopes ee they ere too extreme for the Divieion'e personnel to maintain. This seed can be obtained from e local source and provides e Iow growing cover. If funding perm/ts application of wildflower seed could provide additionel cover end aesthetice. The water meter double check boxes et Parkway Boulevard need to be reset to existing grade. The pull box in the median nose on the east segment of Parkway also needs to be filled to curb height, crowned with the box set et grade, it appears the bricks need to be regraded due to settling. The electrical and traffic signal boxes need to he adjusted throughout the project to grade appearing to have been hit by vehicles installing the lights. Additional compaction, filling, and grading around all light poles should take place in the ~edians of Denton Tap. Seeding of slopes in and around the creeks and bridges needs to be done to protect these from erosion. The Grapevine Creek area where rip rap was added should also be grassed above the rap material. The paver band at Bethel Road southbound appears to be sliding end may require additional sand. The grass in the parkways has not established and the erosion evident eepecielly north of Sandy Lake needs to be controlled aB mud enters the roadway. My recommendation is to seed the area with bermudegrase. RED/bb GRASS.RED February 28, 1990 ~/ Howard Pafferd, Water Utilities Supertntenden~ ~l,~ Walk Through Punch List for the Denton Tap RosSI ~ ~ Improvements Project from Southwestern North to Denton Creek Field personnel have performed a walk through of the above reference project and the following items have been found to be deficient et this tJ~ne: 2. 3. 4. 10o Station 92 + 50 station 101 + 50 Station 104 + 50 Denton Tap & Bethel Station 113 +.25 Station 113 + 76 Station 114 + O0 Station 116 + 25 Station 126 + 55 Station 138 + 00 Valve Cap and Curb Need Painting and Narking Straighten Valve Stack Valve Cap and Curb Needs Painting and Marking Valve Stack ~n the Far West Lane or Denton Tap Southbound Needs CLeaning Out Fire. Hydrant Valve Cap Needs Painting and Mark Curb Wain Line Valve Cap Needs Painting and Hark Curb Guardrail Does Not Permit Operation of Vale Nut No Valve Pad Hanhole Pick Holes Plugged- Clean Out Fire Hydrant Stub Out Dneble to Locate Please insure that eoch of these items have been addressed (corrected) prior to final acceptance of this project. If you have any questions regarding this matter, please advise· Steve Goram, Director of Public Works LIST. Hr.p