ST8402-CS 900123R~: Denton Tap Road Imp~rovements from Sandy Lake Roa~ ' Dear Mr. Balch: We have received and reviewed your letter of January 16, 1990 regarding Contract Close-out. We do not agree that the project was substantially complete on September 20, 1989. The improvements were designed as a six lane divided thoroughfare and as such were not ready for use as a full six lane divided thoroughfare at that time. We will research our field reports and attempt to determine a date when substantial completion was achieved. As soon as we develop this information we will inform you accordingly. With regard to a final inspection of the project, we feel that it is premature to conduct the inspection prior to your completion of the remaining pay item work on the project. The principal items which need to be addressed prior to the scheduling of a final inspection are: 1. Painting of the Cottonwood Branch Bridge 2. Installation of the bridge lighting system In the meantime, we have prepared a partial punch list for the project and transmitted it to you. You have the opportunity, if you choose, to begin work on these items while you complete the unfinished portions of the project. Items which you rectify will be dropped from the list during the final inspection. We caution you that these punch lists are by no means final or complete, but are furnished to you as a courtesy in hopes that they will help you finalize the project as soon as possible. The city of Coppell has requested that you submit, through our office, your anticipated schedule for the final completion of th~ project. 17103 Prcslon Road · Suite I00 · LB II8 · Dallas, Texas 75248 · Phone 214/248-4900 Please call if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer cc: Steve Goram, Director of Public Works File 378 January 17, Mr. John C. Karlsruher, P.E. Ginn, Inc. 17103 Preston Road~ Suite 1~, Dallas, TX ?5248 LB 1 RE: Denton Tap Road Improvements Sandy Lake Road to Denton Creek Contract Closeout Dear Mr. Karlshurer: In accordance with Section ~l?00-CONTRACT CLOSEOUT, this letter shall serve as written notice that the pro~ect is substantially complete. On September 2~, 1989, the northbound traffic was switched to the east side of the median from Station 17~+64 to Denton Creek. The section of proposed roadway from Sandy Lake Road to Station 17~+6A was still under construction by Dallas Water Utilities. At that time we considered that portion of the pro~ect, which was under our control, to be substantially complete~ Joe. the facility was serving its intended purpose. The section of roadway involved in the water line lowering was opened to traffic on December 4~ 1989. Some o~ the items of work remaining on September 20, 1989 were: A. Complete bridge railing. B. Set remaining pull boxes. E. Complete pavement markers for southbound lanes. F. Construct guardrail. H. Complete bridge lighting. Since September ~0, 1989, we have pursued the expedient completion of the items mentioned above as well as various cleanup items. At this time we would like to request an inspection of the project be made to determine the status of completion and subsequently provide us with a list of items of work to be completed or corrected. We are aware that there is still some work to be done on a few of the items listed above. However, we feel those can be added to your final list. We look forward appreciate your Respectfully,' to receipt of a Certificate of consideration. Substantial Completion and Scott J. Balch, P.E. Senior Project Manager L. H. Lacy Company General Contractors 214/357-0146 "Oualily Conslruclion for over 65 Years" 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297