Loading...
ST8402-CS 890912DATE: BY: Larry Davis, Public Works Inspector DENTON TAP ROAD DENTON TAP ROAD - NORTH (North of Sandy Lake Road) Pavement Markings t/~t~/~v, ' Metal Guard Rail on both sides of Bridge Channel shaping around and under Bridge Slope work along Park painting Bridge & Rail Electrical for Bridge Lights Install Bridge Lights Hydro-Mulch Medians & Parkways 30' Dallas Water Main - Lowering ~Lo~er 8" Water for Skaggs - Conflict with Dallas 30"RCP~-L~$~ Install Pull Boxes Li~e Subgrade 34' width at 30' Water Conflict Clean-up DENTON TAP ROAD - SOUTH (South of Sandy Lake Road) Topsoil in Median Islands & Parkways Bridge Railing at Grapevine Creek Bridge Electrical & Lights on Bridge Pavement Markings 1-Drive Approach 4-Wheel Chair Ramps Pull Boxes Channel Excavation & Slope Work Metal Guard Rail off ends of Bridge Hydro-Mulch Medians & Parkways Clean-up Additional Brick Pavers on Nest side of Roadway DTAP GINN, INC. September 8, 1989 MEMO TO: RE: Russell Doyle, P.E., City of Coppell Monthly Report CONSULTING ENGINEERS City Engineer The following monthly report reflects the current status of each of the current active projects that we are working on for the city of Coppell. We have prepared the information in executive summary form for your convenience. We will be happy to expand on the information provided for any particular project should you so desire. STREET PROJECTS - CIP's 1. Belt Line Road (South) Construction began March 2, 1987. Contract completion date September 30, 1988. As of September 30, 1988: Work is substantially completed. Final contract amount to date (with Change Orders) $5,650,587.94 Change Order No. Seven (7) approved by Council on March 28, 1989 Adds $15,627.04 to total contract amount (covers all electrical work for providing power to the irrigation controllers). Contractor has completed the median landscaping, the Change Order No. Seven (7) items and has hydro-mulched the east parkway and medians at this time. A final punch list has been issued to the Contractor. Contract close-out is in progress. A final walk through was conducted on August 1, 1989. Final punch list items are now completed on landscape and irrigation. Street Assessment Program - No activity in July. Calculations for reimbursements to the city for improvements related to Connell Development and Gateway Park under this project can now be finalized. Recommend final payment at this time and maintenance by the City. 2. Denton TaD Road Contracts for both segments awarded April 26, 1988 to L.H. Lacy Co. (total amount $5,151,943.03). A. BELT LINE TO 8~NDY L~KE 8E~M~NT - construction began June 15, 1988; anticipated completion July 2, 1989. Original Estimated Contract Amount including initial $26,000 credit from L.H. Lacy Co. = $3t362,580.00. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900 SUMMARY OF FIELD CHANGES AND CHANGE ORDERS TO DATE FOR BELT LINE TO SANDY'LAKE SEGMENT: Field Change #1 - Reduction in concrete rip-rap quantities; addition of median openings and left turn lanes. Net Change in Estimated Contract Amount = ($56,648.29). Field Change #2 - Repair of existing 12" sanitary sewer (not agreed to yet). Net Change in Estimated Contract Amount = $6,240.00. Field Change #3 - Nullified Field Change #4 - Adjustment of existing water services (2 at $800.00/ea). Net Change in Estimated Contract Amount = $3,200.00. Field Change #5 - Addition of 8" water valves (2 at $775.00/ea). Net Change in Estimated Contract Amount = $1,550.00. Field Change #6 - Nullified Field Change #7 - Relocation of existing 8" waterline conflict with storm sewer Line B. Net Change in Contract Amount = $5,129.00. to resolve Estimated Field Change #8 - Substitution of barrels with metal guard rails for "move and reset portable concrete traffic barriers". Net Change in Estimated Contract Amount = $51.00. Field Change #9 - Addition of 6" water valve (1 at $715.00/ea). Net Change in Estimated Contract Amount = $715.00. Field Change #10 - 2" waterline tap on 16" waterline. Net Change in Estimated Contract Amount = $1,400.00. Field Change #11 - Addition of storm sewer inlet and lateral A-4a at Bethel Road. Net Change in Estimated Contract Amount = $4,425.50. Field Change #12 - Addition of 2" and 3" PVC conduits for street lighting and traffic signal installations. Net Change in Estimated Contract Amount = $2,851.20. Field Change #13 - Revision of median irrigation layout and connections. Net Change in Estimated Contract Amount = $3778.49. Field Change #14 - Tie in drainage system at 500 S. Denton Tap to project storm sewer. Net Change in Estimated Contract Amount = $240.00. Field Change #15 - Additional signage and barricades required for the June 4, 1989 closure of Denton Tap Road from Belt Line Road to Bethel Road for installation of the new rubberized railroad crossing. Estimated net change in Estimated Contract Amount = $1,050.00. Subtotal Field Changes to Date ($28,783.59) Change O~der #1 - Replacement of lime stabilization with cement modification for paving subgrade treatment. Net Change in Estimated Contract Amount = ($7,624.10) Change Order #2 - Re-establishment of lime stabilization in lieu of cement modification of subgrade soils (Change Order #1) at original contract unit prices. Net Change in Estimated Contract Amount = $5,208.50 subtotal Change Orders to Date ($2,415.60) Total Changes in Estimated Contract Amount to Date ($31,199.19)(-0.94%) CURRENT ESTIMATED CONTRACT AMOUNT $3,330,900.81 B. BANDY LAF~ TO DENTON CREEK BEC~M~NT - construction began June 15, 1988; anticipated completion July 11, 1989. Original Estimated Contract Amount including initial $14,000.00 credit from L.H. Lacy Co. = $1,789,363.03 SUMMARY OF FIELD CHANGES AND CHANGE ORDERS TO DATE FOR SANDY LAKE TO DENTON CREEK SEGMENT: Field Change #1 - Revision of property owner names only. Net Change in Estimated Contract Amount = -0- Field Change #2 - Special cast-in-place 2-8'x4' reinforced concrete box culvert in storm sewer Line D at existing 24" sanitary sewer line crossing. Net Change in Estimated Contract Amount = $1,500.00. Field Change #3 - Extra depth 24" drilled shaft from 5'-15'. Net Change in Estimated Contract Amount = $1,441.78. Field Change 94 - Extra depth 24" drilled shaft from 15'-25'. Net Change in Estimated Contract Amount = $401.05. Field Change #5 - Addition of street lighting and traffic signal conduits; revision of median irrigation system. Net Change in Estimated Contract Amount = $5,591.20. Subtotal Field Changes to Date $8,934.00 Change Order #1 - Replacement of lime stabilization with cement modification for paving subgrade treatment. Net Change in Estimated Contract Amount = ($6,808.00) Change Order #2 - Added 5 left-turn lanes and 3 median openings as requested by ABQ Development and Univest Development. Net Change in Estimated Contract Amount = $52,081.27 Change Order #3 - Nullified Change Order #1 and restored lime treated subgrade at its original contract unit prices. Net Change in Estimated Contract Amount = $6,808.00 subtotal Change Orders to Date $52,081.27 Total Changes in Estimated Contract Amount to Date $61,015.27(+3.41%) CURRENT ESTIMATED CONTRACT AMOUNT $1,850,378.30 C. Total cost of both projects including traffic signals, street lights, landscaping, and RxR crossing etc. is approximately $7,200,000.00. Paving of Stage II, left turn lanes and median openings, is complete with the exception of the area of Dallas Water Utilities' 30" waterline relocation just north of Sandy Lake Road. Dallas Water Utilities is lowering their 30" waterline on the east side of Denton Tap north of Sandy Lake Road in order to clear a conflict with new paving and storm sewer. This may be completed by the first of October and has delayed paving in this area. Dallas Water Utilities commenced lowering their 30" waterline in late August. As of August 31, 1989, work completed on the Belt Line to Sandy Lake Road segment was approximately 90% with 116% of contract time used (60 days beyond contract completion date). (This month's percent complete may be inaccurate due to late submission of Applications for Payment by the Contractor). As of August 31, 1989, work completed on the Sandy Lake Road to Denton Creek segment was approximately 92% with 113% of contract time used (50 days beyond contract completion date). (This month's percent complete may be inaccurate due to late submission of Applications for Payment by Contractor). A claim for weather delay in the amount of 60 days on each project has been submitted by the Contractor. Once the Contractor has submitted detailed information regarding this claim, Ginn, Inc. will review and comment accordingly. Street lighting design is 100% complete. TU Electric has submitted a Contract Agreement to the City of Coppell for furnishing and installing the street light system. This item is scheduled to be considered by the City Council at their September 12, 1989 meeting. Design of landscape and irrigation system was completed in May 1989 and is currently being revised for review with Engineering and Public Works Departments. Design of the Traffic Signal Installations for the Bethel School Rd. and Parkway Blvd. intersections and traffic signal modifications for Sandy Lake Road at Moore Road have been completed. Bids were received on July 20, 1989. A contract for this work was awarded to Arjang Electric Systems, Inc. in the amount of $146,387.00 at the August 8, 1989 City Council meeting. The Contract Agreement and Bonds have been executed by the Contractor and sent to the City of Coppell for execution. Arjang has already begun work on the project' by installing the temporary traffic signal at Park~way Blvd. prior to the opening of the new High School. Street Assessment Program - No activity in August. WATER PROJECTS - REVENUE BONDS 3. 24" Cross-town Water Line Contract awarded to McLean Construction Co., Killeen, TX, on December 13, 1988 for the amount of $1,377,797.30. Issued Notice-to-Proceed with construction to begin on or before February 13, 1989. 150 calendar day contract. July 13, 1989 completion date. As of August 31, 1989: Work is 100% complete and contract time is expired. Contractor has submitted request for 60 day time extension. Field Chan~e NQ. 1 - deleted construction of portion of 16" line on west side of Denton Tap Road at Parkway Blvd. Net deduction of $26,034.00 from contract amount. Field Chan~e No. 2 - Per Public Works Dept.'s request, 8" waterline along Southwestern Blvd. at Grapevine Creek tied into the 24" Crosstown Waterline to alleviate maintenance problems at the creek crossing by allowing for the abandonment of the old 8" waterline. Net deduction approximately $505.00 from contract amount. Field Chan~e No. 3 - Relocated butterfly valve at Sta. 156+50 to revised Station 159+50. No chanqe in contract amount. Field Chanoe No. 4 - At intersection of Belt Line/Denton Tap, extend 48" casing pipe 10' west and 23' east to avoid conflict with traffic signals. Add $3335.00 to contract amount. Field Chan~e NO. 5 - Relocate 8" waterline installation at Moore Road/Carter Drive intersection due to utility conflicts. Net deduction of $250.00 to contract amount. Field Chan~e NO. 6 - Fabricate special flanged closure section, with butt strap connection, handholes, etc. for tie in to Village Parkway Pump Station contract. ADD $2,775.00 to contract amount. Field Chanae No, 7 - Provide 8" flush assembly at station at station 62+63. Add $925.00 to contract amount. Current opinion of probable total project contract cost is $1,372,356.80 or $5,440.50 under contract bid amount. Project substantially completed as of August 25, 1989. Final walk-through made on August 30, 1989. e Ground ~toraae Tank Contract awarded by Council on August 2, 1988 to Preload Construction Co., Inc. of Garden City, NY. Contract amount is $2,088,750.00. Notice to Proceed issued 8/29/88. 345 calendar day contract. Contract completion date to be 8/9/89. Tank is substantially complete. applied and brick pilasters are and fencing remain. Filling and testing of the tank will Cajun's problems with offsite waterline. As of August 31, 1989: 100% time completed. No change orders to date. Thorocoat has been re- complete. Minor site work be delayed due to used and 98% work Pumn Station Contract awarded December 13, 1988 to Cajun Contractors, Inc. (2nd low bidder) for contract amount of $2,336,772.00 which includes the assignment of $179,172.00 of Worthington (Dresser) pumps. Notice-to-Proceed was issued January 26, 1989. Contract time is 300 calander days. Contract completion date: November 22, 1989. Flood water release has subsided and Contractor is evaluating damage to bore pits. Off-site pipe laying may resume by 9/15/89. Pumps and motors have arrived. Interior finish-out underway. Testing of on-site piping is underway. Landscaping plan has been approved by Sunbelt and Lake of Coppell Owners Association. Anticipate bidding of landscape plan by late September. As of August 31, 1989: 73% time used and 82% work complete. Chanae Order No. 1: Approved by City Manager to alleviate utility conflicts, delete some road bores and accommodate the re-surfacing of Kimbel Kourt. No change to contract time or value. ~~__~: Approved by City Manager. This Change Order was requested by the Building Inspection Department to install remote electricity service disconnects. Increase in contract amount: $2,300.00 Chan~e Order #7: Approved by City Council. This change order was for additional compensation for deeper foundation piers necessary to reach a suitable footing material. No change to contract time. Increase in contract amount $8,434.00. Total Change Orders to date: $10,734.00 increase. I,~?SCELL~%NEOUg PRO,YECTS 6. P & Z Working with staff on as-needed basis. Current projects are: Shadowridge Estates - Fourth Increment, Shadowridge Estates - First Increment, University Park, Meadows Section 6, Shadow Woods Estates Addition, Oakbend Addition, Country Estates Addition, Connell/Skaggs drainage, Park West Commerce Center. 7. Parkway Blvd. ¢Citv Hall) Project design completed. Cost estimates and contracting options have been submitted to City Engineer on June 13, 1989 for consideration. Ginn, Inc. awaiting further direction from City Engineer. 8. FloodPlain Administrator No items last month. Working with City on as-needed basis. 9. Bethel School Road/Pelican Lane Drainaqe ImProvements City Council approved funds June 27, 1989. Contract awarded to SYB Construction Co. for $76,789.00 for construction of Base Bid items, Site 1, Site 2 and Site 3. No alternatives were funded. Notice to Proceed - July 17, 1989; 60 calendar day contract. Need to get executed easements from affected homeowners filed with Dallas County. Resolution of Mr. Widener (Lot 15) easement has been completed. Project is approximately 86% complete. Only work remaining is site 3 improvement. 10. WhisDerina Hills Drainaqe Study Ginn, Inc. received work authorization on June 26, 1989 (280-241-001). Preliminary Engineering study and Report was submitted on July 14, 1989. We await further action from the City. The following projects below need to be authorized by the City prior to our commencing: Water Master Plan per the Dallas Contract Mapping Thank you for the opportunity to work with the City of Coppell on these and future projects. Respectfu~lly submitted, Consulting Engineer A note]~rom ~ RUSS DOYLE