Loading...
ST8402-CS 890823GINN, INC. CONSULTING ENGINEERS August 23, 1989 Mr. Scot/Balch, P.E. L.H. L g dy Co. P.O. ~x 541297 Da~s, TX 75354 R~: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek Dear Mr. Balch: We have been instructed by the City of Coppell to negotiate a Change Order with L.H. Lacy Co. for the refinishing of the steel columns beneath the Cottonwood Branch Bridge. It is our request that you furnish a proposal to perform the work required under the TSDHPT 1982 Standard Specifications, Item 446, Protection System 3 - Aluminum. The scope of work shall include refinishing all col-mns from a point 1 foot below the final grade of the Cottonwood Branch Channel (see sheet 31 of 56 of the Contract Drawings) to the top of each column. Your proposal should include a lump sum price for this work with a labor and material breakdown and a schedule indicating a proposed duration for the work referenced herein. We request that you submit your proposal on or before Friday September 8, 1989. Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer cc: Steve Go~,~ Russel~'DolF/~%' P.E. Stan ~ed, P.E. H. Wg~ne G%nn, P.E. Rand~] Fleming File 379 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900