ST8402-CS 890809~The City With A Beautiful Future
August 9, 1989
Mr. Wayne Ginn
Ginn, Inc.
17103 Preston Road
Dallas, Texas 75248
P.O. Box 478
Coppell, Texas 75019
214-462-0022
RE: Bridge on Denton Tap at Cottonwood Creek
Dear Wayne:
Staff has met with John Karlsruher and Stan Reed at the bridge
on Denton Tap which crosses Cottonwood Creek. Their purpose was
to identify and dismiss bridge rating concerns noted by the SDHPT
BRINSAP Report.
All but one item as identified by Mr. Reed was acceptable. This
item is that the steel pilings are "rusting at ground line". The
recommendation by Mr. Reed was to clean and paint the piles as
necessary.
Public Works at this time does not have the resources to address
this matter and requests a change order by submitted to the Denton
Tap project. The change order is being requested because the scope
of work being performed to that bridge involved improving it and
therefore all facets of that improvement should be covered. This
change order should complete the improvement and provide the city
with a product which should require little maintenance in the near
future.
Ple.ase adv.ise/~f any additional
offxce. / (~
Director of Public Works
information is required from this
SGG/sm
cc: Russell Doyle, City Engineer
Per Birdsall, Street Superintendent