Loading...
ST8402-CS 890601GINN, INC. CONSULTING ENGINEERS June 1, 1989 Mr. Scott~ a~lch, P.E. L.H. Lacy Co. P.O. BoX 541297 Dallas, TX 75354-1297 Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek - May 5, 1989 request for time extension Dear Mr. Balch: After review of your May 5, 1989 letter~ ~ documentation, we agree with your request for~three calen~ar~ day extensio o t time. The new cont on date will ~ly 11,~ Please call me--have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer JCK/dsp cc: Russell Doyle, P.E. w/enclosure H. Wayne Ginn, P.E. Randy Fleming w/enclosure File 379 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 MAY 5, 1~8~? 10; GINN, 1NC., CONSULTING F-NGINEEI'~S ) 7105 PIkES'ION ROAD SUITE lO0, LB'-I18 DALLAS, TEXAS 75248 ATTN: JOHN C. KARLSRUHER, P.E. PHOJEC f: liE:: DEN'[ON TAP ROAD IMPROVEMENT FROM SANDY LAKE' l'O DENT'ON CREEK I:~llOJ EC'I'O GINN'S I.E'i"TER DARED APHIL 2J, ~8~ CONCERNING CHANGE ORDER 3 TIME EXTENSION DEAR JOHN, THERE ARE TWO SEPERATE ISSUES CONCERNING THE TOTAL TIME DELAY RELATED TO THE CEMENT/LIME TREATED SUBORADE MATTER. PLEASE NOI'E THE FOLLOWING: ~> L. H. LACY CO'S I.ETTER OF DECEMBER 22, 1~8~ REQUESTING THE THREE DAYS OF' DECEMBER 17/18/1~, 1~8~. (SEE AT'IACHED COPY OF LETTER). 2> L. H. LACY CO'S LETTER OF JANUARY 14, 1~8c2 REQUESTING THE FIFTEEN DAYS OF' DECEMBER 20, 1~89 THRU JANUA~Y ~, (NOT INCLUDING ~ SCHEDULED NON-WORK HOLIDAYS). (SEE A'[TACHED COPY OF LETTER). THEREFORE ITEM I RAS NOT ULTIMA'FEL¥ BEEN INCLUDED AS A PAR]' DF CHANGE []RDER NO. 3. '.;INCERELY, SCOTT BALCH, P.E. PROJECT MANAGER L'.I..:: FILE 310 CORRESPONDENCE t.l'l '1 ACHMENTS: L. H. LACY ED'S LEI'TE~ OF DECEMBER 22, lOP88 G1NN, INE'S LEI'TER DF' DECEMBER 27, 1~88 L. H. LAL:Y CO'S LETTER OF' JANUARY 14, L. H. LACY CO'S LETTER DF APRIL 11, 1~87 GINN, INC'S LET'TER OF APR1L 21, 1~89 L. H. Lacy Company General Contractors 214/357-0146 "Oualily Conslruclion lot over 65 Years" 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 LETTER OF TRANSMITTAL [~Y L. H, LACY COHPANY DATE DECEMBER 22? 1~88 ['~INN? INit.., CONSULTING ENGINEERS 1710."". PRES'.ruI'4 I¢OAD SUITE 100., L[~-118 DALLAS., TEXAS 752~ '8 JOI4N C. KAF{LSr~UHER., P. E, DENTON TAP ROAD IMPROVEMENT F~C)M BELT LINE TO SANDY LAKE CPROOECT 57c/) Rt.: f¥{ZTICAL F'ATH BI'LAY - CEMENT MOBIl=lED SUBGRADE DEAR JOHN~ iN t~EiS~RDS 'ro THE DELAY CAUSED BY THE PROt~LEM WITH ]'HE TESTI~ I~EQUII:<EMEN]'S FOI~ THE CEMENT MODIFIED SU~GRADE ON THE ABOVE REFEI.{RENCED PROdECT - THE L. H. LACY CO. NAS NOT ABLE TO PLACE SUUG[{ADE STADILZZA]'ION CEMENT ON SATURDAY DECEMBER 17~ 1~88 OR MONDAY DEC~M~ER 1~, 1~8 ON PROJECT 578. AS EVIDENCE:D DY THE COMBINED CONSTRUC3ION SCHEDUL~ SUBMIT'TE~ WITH THE MON~rHLY ESTIMATES. L. H. LACY N~QUE~T THREE CALENDAR DAYS BE ADDED TO THIS PNO~EC'¥. RESPEC'rFtJLLY, DAVID M. SNYDER~ P.E. PROJECT HANAOER GINN, INC. Dscs~he; 27~ 1988 CONSULTING ENGINEERS L. H. Lacy Company 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354 Attention: David M. Snyder, P.E. Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek, Coppell, Texas. Dear Mr. Snyder; We are acknowledging receipt of your December 22, 1988 letter requesting a three calendar day extension to your Contract for the subject project. We will take this matter under advisement and inform you of the City of Coppell's decision when it is rendered. Please call me if you have any questions. Sincerely, cc: Russell Doyle, P.E., w/enclosure Randy Fleming, w/enclosure H. Wayne Glnn, P.E., w/enclosure File J-379 (A:J379del) 17103 Pt=ton Road · Suite 100 · LB 118 · Dallas. Texas 75248 · Phone 214/248-4900 GZNN,, llqC. ~ CONSULTING 1710J PKES'I ON ~OAD DAL. LAG. lEXAG 7524~ Al"'rN: JOHN C;. }(A{':;LSRUH[{[<~, P.tL. DENliH'~ IP,:-' R:ii/.:~D IMF'~OVE. MEhlT F:F¢OM ,~ANDY LAI(E 'fO DEN'f[JN [;RI ;'IL':A;.. PATH I;,ELA'~ -- CF. MEN"[ MODIFIED SOI~/GRADE DEA[k ~OHN~ 11'4 REOARDS TO 'I'HE~ [)FLAY CALIBED DY P~L]I)LEMS i~i'[H I'HE 'I'~S"fIN~ R~U~RL~NI~ FOR TI{~ C~N'I' ~ODll:'~D ~U~I,g~D~ O~DE~ 1>, THE L. H. LADY CO. REQUESTS IHAT A TWO WE~V. TIME EXTENSION D~ ADDED TO OU~ OON]'~ACT TIME VOFI THE SEASONS: 1~ THE INABiLITY'FO~ ]~HE TNEAT~D SOiL TO OONSISTEN'I'LY YI~LD MOF{E ]NAN AN 88% OF A.S.T.'M. 1557 DENSITY P~00~O~ (~0% OV A.S.T.M. 1557 WAS SPECIVI~D~. THE L. H. LACY 00. OPERATED ON THE 90% OV A.S.'f.M. 155/ DENSI IY PROCTOR ~E~UIREMEN'{'S F'~OM DEC~MDE~ THRU ~ANUA~Y t?~ l~Se/ (A PE~IOD OF 21 DAY~ ~I]'H ~CHEDULED NON-WOrK DAYS AT CHRISTMAS $~ N~W YSA~'S~ STADIL1ZAT10N IS A CONTINUOUS O~E~ATION ON ~OTH 57~ ~ 57~. ~ORK, AND 0~ DELAYS ON THE SOUTH DIRECTLY AFFECT TIdE NORIH WITH R[SP~CT 'rD THE DiFFICuLTY OF STA~ILIZIN~ THE SuBORRDE DY ~EPLACING LiME WiTH CEMENT 30 REDUCE THE P. 1.~ PlAiNLY DUE TO OUR iNAUILITY TO AGREE ON THE SPECIFICATION & M~THOD, NE REQUEST THAT CHANGE OI'~DE~ i BE AMENDED ]'0 QUANTITY ZERO~ WAS PERF'ORMED). THE L. H. LACY CO. WILL GO ~ACK TO CONTRACT SPECIFICATIONS FO~ ALL OF THE PHASE I~ AND ALL THE PHASE I1 WORK FOR ]'HIS ~ESPEC'I'FULLY h · · DAVID M. SNYDEF% P.E- PROJECT MANAG£R L H. Lacy Company General Contractors 214/357-0146 -Quality ~on$1ruction for over 65 Years,' 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 CC: F*';[L.I:* ~.,I. 0 L. II. La~y Compmly General Contmctom 214/357-0146 10888 Shady Trail P.O. Box 541297 Dallae, Tex~ 76354-1297 GINN, INC. CONSULTING ENGINEERS April 21, 1989 Mr. Scott Balch, PSE. L.H. Lacy Co. P.O. Box 541297 Dallas, TX 75354-1297 Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek - Coppell, TX Dear Mr. Balch: It is my understanding that this request was ultimately included in Change Order No. 3 which we are about to forward to the City of Coppell for consideration. Please check your records and see if you agree. have to amend Change Order No. 3 accordingly. If not, we will Please call me if you have any questions. Sincerely, Karlsruher, P.E. Project Engineer JCK/dsp cc .' H. Wayne Ginn, P.E. Randy Fleming File 379 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900