Loading...
ST8402-CS 890517 GINN, INC. May 17, 1989 Mr. Russell Doyle, P.E. city Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Lake Road, Approvals. CONSULTING Improvements from Belt Line Road to Sandy and from Sandy Lake Road to Denton Creek - FEMA Dear Mr. Doyle: This letter is in response to your Handwritten Memorandum of May 10, 1989, copy attached. Attached you will find additional documentation including the Conditional Letter of Map Revision for the Denton Tap Road bridge structures over Grapevine Creek, which should complete your files regarding to the floodplain aspects of the subject projects. Please note that the Conditional Letter for the Grapevine Creek bridge structures requires that as-built drawings, HEC-2 hydraulic models and supporting data must be prepared and submitted to FEMA for verification of compliance with the Conditional Letter as soon as construction is completed. It is our intention to furnish these services under special services ' ro'ect, however you m~y contract direct~Horn and Assoc~tes, Inc. for this if you wish. Please let us know your intentions regarding the foregoing as soon as possible. On the advice of our Floodplain Hydraulics/Hydrology Consultant, Kimley-Horn and Associates, Inc., there was no submittal prepared or made for the widening of the Cottonwood Branch bridge structure. Their opinion of the plans to widen the existing bridge structure was that since the hydraulic cross section of the bridge was not being changed, the affects on the floodplain and base flood elevations would be negligible. Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer attachment cc: H. Wayne Ginn, P.E. Ron Morrison, P.E. - Kimley-Horn and Associates, Inc. File J-378, 379 (a:denfema) 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900