ST8402-CS 890203GINN, INC. PC CONSULTING ENGINEERS February 3, 1989 Mr. David M. Snyder, P.E. L. H. Lacy Company P.O. Box 541297 Dallas, Texas 75354-1297 Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek - Dallas Water Utilities' 30 Inch Water Line Lowering Dear Mr. Snyder: As a follow-up to your letter of January 20, 1989, regarding this issue, I contacted Mr. Jim Rogers of Dallas Water Utilities this morning. Mr. Rogers informed me that the design of the lowering is complete with drafting to be completed today. Upon completion of drafting Dallas Water Utilities will issue the drawings to Gifford-Hill for fabrication of the necessary pipe and fittings. DWU will not be able to schedule their City Forces crews to construct the lowering until they are able to determine the fabrication and delivery date of the necessary pipe, fittings and materials. Mr. Rogers did mention that he anticipated lowering about 200 feet of the water line to resolve the conflict. This information may be helpful to you in planning your construction activities in the area until we have a definite schedule from Dallas Water Utilities. It is the Contractual obligation of L. H. Lacy Co. that the actual horizontal and vertical locations of all underground utilities be verified prior to the beginning of construction, and all discrepancies and conflicts be immediately brought to the attention of the Engineer for resolution. Since most of the utility work for this project was completed prior to verification of the location of the 30 inch water line, we do not believe that L. H. Lacy Co. has any basis for a claim for a delay as a result of the subject conflict. Accordingly, you should plan your sequence of construction to accommodate this situation. Please call me if you have any questions. Sinc~erely, ~ Project Engineer enclosures~"/ iiii cc: H. Wayne Gi~, P.E. Randy Flying File J/ 379 (a:37930wl) 17103P~cstonRoad · Suitel00 · LBII8 · Dall~%Tcxas75248 · Pho I 8-4900 A T T N: PROJECT: DEAR JOHN, OANUAF(Y i[07 G1NN, iNC., CONSUL. 1 INi5 I:[NE~IIxlEERS 17103 PRES]Oi',I ROAD SUITE 100, LB-liB DAL. L.,qS, TEXAS '75248 IIIIIL~o -::~ ~-':, 'lJ [/ [~ IIY ~)OHN I'::.ARLSRUHER, F'. E1 I)ENTON I'AP ROAI) IMPROVEMENT FREIM SAN1)~' L_AKE -I'O DENT[tN CREEK PROJECT ~.,S THE L.. H. LACY CO. REQUESTS THE CURRENT STA'rlLIS, AND FO~,olIt.,..E SCOPE OF WORK ANTICIPATED BY THE DALLAS WATER UTII_IT1ES DEPARTMENT. THANK-YOU. RESF:'EC'FFULLY, DAVID M. SNYDER~ F::'.E. F'F~L JEC.T M.ANAGER L. H. Lacy Company General Contractors 214/357-O146 "Quality Construction for over 65 Years" 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 o December ~-, 1988 [ L. H. LACY CD. Ginn, Inc., Consulting Enqineers 17103 Preston Road Suite 100, LB-118 Dallas, Texas 75248 Attn: John C. Karlsruher, P.E. Project: Denton Tap Road Improvements From Sandy Lake To Denton Creek Project 379 City of Dallas 30" Water Line Dear John: While attempting to install lateral D-22 on Monday, November 28, 1988, our subcontractor, American Developers, uncovered the 30" City of Dallas Water Line. It's at offset 167+32 and on the plans shows to be approximately at 44' right of centerline. We have a field shot that shows it to be at 42.7' right of centerline. The horizontal location is not a problem; however, the vertical location of the 30" water line on the plans shows to be at an elevation of 488.5 at 44' right of centerline. The actual field ties show the 30" water line to be at an elevation of 492.21 at 42.7' right of centerline. This interferes directly with the lateral pipe and there would only be three or four .tenths clearance below the bottom of paving at this station. With the existing drainage structures and existing intersection at Sandy Lake, there may be no recourse other than that the City of Dallas lower their 30" water line. Per our most recent schedule, we show Phase II excavation to start in the third week of January, 1989 and we show Phase II subgrade preparation to start in the second week of February, 1989. We have some time to solve the problem, but that window will close rapidly. It is L. H. Lacy's intention to pave Phase II on the North Project before we pave Phase II on the South Project. As we have stated before, it is our intention to finish the North Project as soon as possible. This will allow us to concentrate our efforts on the completion of the South Project. L H. Lacy Company General Contractors 214/357-0146 "Quality Construction for over 65 Years' 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 December 5, 198~ John C. Karlsruher, P.E. Ginn, Inc., Consulting Engineers Page 2 We know from previous conversations with the City of Dallas_. Water Department that it would take two (2) to three (3) 'days to drain the 30" line once the valve had-been shut-off-. Any solution(s) that will avert the relocation of the 30" water line appear to be well warranted. L. H. Lacy Company will have American Developers locate the 30" water line for f~eld ties at laterals D-14 and D-16 as soon as possible. When this information is available, copies will be forwarded to you. Respectfully, David M. Snyder, P.E. Project Manager DMS/ll cc : Ron McAvoy File 310 Correspondence Enc: Field Notes Chart