ST9302-CS 990902 (2)TELEPHONE (214) 358-6581 TE~,E~: 820590 FAX (21,4) :a~S2-"a201 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX B40787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS. TEXAS 75220 September 2, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project it: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: Enclosed for your review and incorporation into the contract are two executed copies of change order #2. If you have any questions regarding this change order, don't hesitate to contact our office. ~i'fi~erely, [ {~ Project Engineer Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER CITY OF COPPELL CHANGE OR EXTRA WORK OP ER PROJECT: CONTRACTOR OWNER: CHANGE ORDER #: SANDY LAKE ROAD PROJECT # ST 93-02 ED BELL CONSTRUCTION COMPANY CITY OF COPPELL 2 DATE: 8/23/99 ADD: Item # (~uantity Unit Description Unit Price Total Price 50 LF Extend drain line from property line to sewer 22.50 1,125 2 EA Connect lateral into storm drain 550.00 1,100 2 EA Install cleanout at property line 300.00 600 280 LF 6" Sch 40 PVC electric conduit (bored) 24.00 6,720 1050 LF 6" Sch 40 PVC electric conduit (open cut) 8.00 8,400 360 LF 2" Sch 40 PVC electric conduit (open cut) 3.50 1,260 1 EA Remove / Replace Air release valve at Sta. 11 + 50 1,950.00 1,950 2 EA 16"x8" RCCP wet tapping sleeve & valve 2,680.00 5,360 9 EA 16"x8" DIP tappin§ sleeve & valve 3,025.00 27,225 1 EA 16"x4" DIP tapping sleeve & valve 3,180.00 3,180 9 EA 16"xl" DIP service connection 1,840.00 16,560 1 EA 16"x2" DIP service connection 1,300.00 1,300 2 Tons Ductile iron fittings 2890.00 5,780 1 EA Reconnect sanitary sewer line @ STA 15+77.13 580.00 580 TOTAL Addition $81,140 DELETE: Item # Quantity Unit Description Unit Price Total Price 87 400 LF 16" water main 62.00 (24,800) 96 8 EA 8" ~ate valve 800.00 (6,400) 97 1 EA 6" gate valve 650.00 (650) 98 1 EA 4" §ate valve 520.00 (520) 103 12 EA Connection to existing water main 1,050.00 (12,600) 106 9 EA 1" water service 1,000.00 (9,000) 108 1 EA 2" water service 1,500.00 (1,500) 116 400 LF Remove 16" water main 6.00 (2,400) TOTAL Deletion ($57,870) TOTAL CHANGE ORDER #2 $23,270.00 Previous Contract Amount Total Change Order #2 Revised Contract Amount Net Increase in Contract Time of Completion Revised Contract Time of Completion $8,456,664.00 $23,270.O0 $8,479,934.00 27 Days 891 Days The contractor hereby accepts this contract adjustment as a final and complete adjustment in full accord and under any clause in the C4bntract by reason for this revision :oat~ShfeaC~ioO~2afct.all past and future liability originating ~ ~t'~ ~, .~;:,~ Acc,~t-ed by Ov~er/) Date Recommendec~ By ~ity Engineer Date ~ Agreed to~y ContTr t ~ Date (~~ pT. oh~8oC~t4Y?sWith A Beautiful Future RO. Box 478 Coppell, Texas 75019 972-462-OO22 August 27, 1999 Robert Weber, Project Engineer Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Re: Sandy Lake Road Project # ST 93-02 Change Order No. 2 Dear Mr. Weber: Three copies of proposed Change Order No. 2 are enclosed for your review and execution. If you are in agreement with the Change Order please sign the three executed copies and return two copies to the City of Coppell Engineering Department. If you have any questions or need more information please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works cci Lee Allison, Kimley-Hom Start Phillips, Inspector file/ST93-02/bell/827991tr Kimley-Horn and Associates, Inc. August 20, 1999 Mr. Robert Weber Ed Bell Construction Company P. O. Box 540787 Dallas, TX 75354 Re: Sandy Lake Road Reconstruction Coppell Project #ST93-02 KHA No. 061087000 Dear Robert: Three copies of proposed Changer Order No. 2 are transmitted herewith for your review and execution..A copy has been faxed to the City of Coppell for their simultaneous review. If you find the Change Order to be satisfactory, then please forward all three executed copies to Ken Griffin. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Lee K. Allison, P.E. LKA:pts Attachment Copy to: Ken Griffin, P.E. p:\061087.00\ltr\CO $9..ltr .doe · Suite 1100 801 Cherry Street Fort Worth, Texas 76102-6803 · TEL 817 335 6511 MET 817 654 4266 FAX 817 335 5070 KIMLEY-HORN AND ASSOCIATES, INC. 801 Cherry Street, Suite 1100 Fort Worth, TX 76102 KHA # 061087000 Date: August 20, 1999 CHANGE OR EXTRA WORK ORDER NO. 2 PROJECT DESCRIPTION: CONTRACT: OWNER: CONTRACTOR: ORIGINAL CONTRACT AMOUNT: CHANGE ORDER No. 1: CURRENT CONTRACT AMOUNT: Coppell Sandy Lake Road Paving, Drainage, and Water System Improvements ST 93-02 City of Coppell, Texas Ed Bell Construction Company $8,436,364.00 $20,300.00 $8,456,664.00 CHANGE OR EXTRA WORK TO BE PERFORMED Item Approx. No. Quantity Unit 1. i LS 2. 1 LS 3. I LS 4. 280 LF 5. 1,050 LF 6. 360 LF Description of Item Unit Decrease in Increase in Price Contr. Price Contr. Price Extend drain line from property line $1,125.00 to sewer Connect lateral into storm drain $2,200.00 Install clean-out at property line $1,200.00 6" Sch 40 PVC Elec. Conduit - $24.00 Bored 6" Sch 40 PVC Elec. Conduit - Open $8.00 Cut 2" Sch 40 PVC Elec. Conduit - Open $3.50 Cut $1,125.00 $2,200.00 $ !_,200.00 $8,400.00 $6,720.00 $1,260.00 Total Increase in Contract Amount Total Decrease in Contract Amount Net Increase (Decrease) in Contract Amount Revised Contract Amount Original Contract Time Change Order No. 1 Net Increase/(Decrease) in Contract Time of Completion Revised Contract Time of Completion $0 $29,905.00 $20,905.00 $8,477,569.00 850 Days 14 Days 12 Days 876 Days Recommended by Kimley-Horn and Associates, Inc. Accepted by Contractor By P:~61087.00\1t r ~Chgord2.doc Approved by Owner By. Distribution 1 - Owner 1 - Contractor 1 - KHA Office Sent By: EBCC'; 214~52~201 2143523201; Aug-~ 39 7:38AM; Page ED BELL CONSTRUCTION COMPANY P.O. BOX 540787 DALLAS, TX 75354.0787 FACSIMILE TRANSMITTAL SHEET FROM; Robert D. Webea: TOTAl. NO. OF P&G. ES [bICLUDING COYER: R SENDER'S RE;i;F-P,.ENCl=- NUMBE : RE; YOUR REFERENCE NIJMIIER: URGENT ~] POR REVIEW ~] PLEASE COMMENT r~ PLEASE REPLY ~] PLEASE RECYCLE NOTE$/COMMli.~ fS: (214) 358-6581 VOICE (214) 352-3201 FAX 2143523201; Aug-24~.~9 7:39AM; Page 3/5 Sent By: EBCC; ._. February 15, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppcll Proj~t #: ST 93-02 Kimley-Horn Project #: 06940600 DWIJ Project #: 98-311F Dear Mr. Griffin: It is our understanding that the sanitary sewer work at STA 15-77.13, 18.06 Lt. lms been modified to the following scope of work: t. Remove thc existing sanitary sewer manhole, 2. Reconnect the north to south 8" sanitary sewer line after removing file old mmlhole. 3. Plug the sanitary sewer line to the west of the old manhole. 4. Do not construct a new sanitary sewer manhole. Our contract with thc City addresses all of the required items of work, except for reconnecting the smfitary sewer lines to thc north and south of the old manhole. Our price for making this connection is $580.00 plus the applicable footage of sanitary sewer pipe necessary to make the connection, If you have any questions regarding this issue, don't hesitate to contact our office. Sincerely, Ed Bell Construction Company Robert D. Weber Project Engineer xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 Sent By: EBCC;, , FAX ('art4) 2143523201; Aug- 24;.~.9 7:39AM; Page 4/5 ED BELL CONSTRUCTION COMPANY POST OFFICE: BOX S&0787 IO80g NARRy HINES August20,1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: As discussed in our August 17, 1999 monthly meeting thc nccd for a casl iron fitting price for thc additional fittings required to adjust water lines to miss existing utilities was necessary. Our price for cast iron fittings by the ton is $2,890.00 per ton. Two tons of additional fittings should be sufficient to cover any problems that occur on the project. Please add this item to the next change order. If you have any questions regarding this price, don't hesitate to contact our office. rcly, ~ ~x~nT~cti°n C°mpany Kobert D. Weber Project Engineer x¢: Michael G, DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OppORTUNITY EMPLOYER Sent By: EBCC; 2143523201; Aug-24c~99 7:40AM; Page 5/5 January 2, 1999 Mx. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Sandy Lake Road Reconstruction Coppcll Project #: ST 93-02 Kimley-Hom Proj,ct #: 06940600 DWU Project #: 98-31 IF Dear Mr. Griffin: As requested, our utility subcontractor, M-Co Construction, has submitted pricing for extending roof drains and yard/fn,-nt:h drains into the proposed or existing storm sewer system. They have proposed that the following items and prices be established to pay for this type of work, should it become necessary: extend drain Iatcral from property line to storm sewer LF connect lateral into storm drain EA install clean out at property line EA $22.50 per LF $550.00 per EA $300.00 per EA It is our understanding that two locations for this type of work have alreadY been identified. If you have may questions regarding this issue, don't hesitate to contact our office. Sincerely, Ed Bell Construction Company Robert D. Weber Project Engineer Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Tt::~as 76102-6803 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR OWNER: CHANGE ORDER #: SANDY LAKE ROAD PROJECT # ST 95-02 ED BELL CONSTRUCTION COMPANY CITY OF COPPELL 2 DA TE: 8/23/99 Item # ~uantity Unit Description Unit Price Total Price 4~,~ ~ ::Extend drain line from property line to sewer ~.--~1','~5':0~ 1,125 ~ Connect lateral into storm drain ~ ,14 ~ I~ fd. Install cleanout at property line "130~L,,7,00d~ ~ 1,200 280 LF 6" Sch 40 PVC electric conduit bored 24.00 6,720 1050 LF 6" Sch 40 PVC electric conduit open cut 8.00 8,400 360 LF 2" Sch 40 PVC electric conduit open cut 3.50 1,260 1 EA Remove / Replace Air release valve at Sta. 11 + 50 1,950.00 1,950 2 EA 16" xS" RCCP wet tapping sleeve & valve 2,680.00 5,360 ~9 EA 16"x8" DIP tapping sleeve & valve 3,025.00 ~-'/2,~5 1 EA 16"x4" DIP tapping sleeve & valve 3,180.00 3,180 9 EA 16"xl' DIP Service connection 1,840.00 16,560 1 EA 16"X2" DIP service connection 1,300.00 1,300 ~. ]t~ ~, ~)oe.~ ~ ~o~ ~-~ ]'~ TOTAL Addition ~°~O ~ DELETE: Item # ~uantity Unit Description Unit Price Total Price 87 leO~ LF 16" water main 62.00 96 8 EA 8" gate valve 800.00 (6,400) 97 1 EA 6" gate valve 650.00 (650) 98 1 EA 4" gate valve 520.00 (520) 103 ~1'~ EA Connection to existing water main 1,050.00 106 9 EA 1" water service 1,000.00 (9,000) 108 1 EA 2" water service 1,500.00 (1,500) 116 ~o~} LF Remove 16" watermain 6.00 TOTAL Deletion ($~) ~Total Change Order//2 ,'-'-,l~revi°us Contract Amount Revised Contract Amount Net Increase in Contract Time of Completion Revised Contract Time of Completion $8,456,664.00 891 Days The contractor hereby accepts this contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason for this revision to the Contract. Accepted by Owner Date Recommended by City Engineer Date Agreed to by Contractor Date ~c~ gJZ o_ O l~2 =o l 4 s 817 335 50?0 AUG EO '99 09:28AM KIML~-~'~HORM FT WORTH P.1/6 and Associates, InC. Fax Transmittal 801 Cher~j Str~t Worth, T'X 76102-6803 TEL 817 335 6511 FAX 817 335 5070 Original coming by mail: Yes: No: Fax No.: Job No.: Date: If you have any problems, please call 8171335-6511 and ask for: Total number of pages, including cover sheet: ~' Plan~ing r£nwrOnment~l Consultants This facsimile is intended only for the addressee named herein and may contain inter--till, If you are not the intended recipient o[ the employee or agent responsible for delivery to lhe addressee, you are hereby ootifi~ that any revie~ dissemination, disctosure, or copying et this communication is strictly prohibited. If you have received this fac$im#e in er/or, please immediately notify us by telephone, and return the original facsimile to us at the address above via the U.S. Postal Service Thanlt you. ;en~ 09:~9AM KIMLEY-HORM FT WORTH1; Aug-17 ED BELL CONSTRUCTION COMPANY i,,o~vr'oIrFICE: BO~ IS4074)? 10805 HARRY HINF,,$ August 17, 1999 Mr. Kenneth M. Griffin, P,E, Director of Bring and Public Works City of Copp¢I1 255 Parkway I}lvd. Copp¢ll, Texas 75019-4a09 ,R.C; 5ax~dy Lal~ Road R~constru~tiola Coppcll Project #; ST 93.02 Kimley-Hom Project #: 06940600 DWU Proj~x:t #: 98-311F Dear Mr. Griffin: As discuss~ dumlg our August 17, 1999 monthly meeting on the referenced project, ~e tbllowing information x~pre~nts our understanding of thc conduit crossings z~ntuix~ by TU Electric prior to paving this pwj~ct: ~ _6'[IOvcn) _2" (O~_ eh) STA 9+-00 2x6" SCH 40 'PVC 90 LF STA 17+70 2x6" SCH 40 PVC 100 LF STA 45+55 1 x2" SCI'{ 40 PVC STA 49+72 Ix2" SCH 40 PVC STA 53444. lx2" SCH 40 PVC STA 55.85 2x6" SCH 40 PVC 90 L'F STA 76+54 2x6" SC_~ 40 PVC STA 104+85 2x6" SCH ~.0 PvC , Totals 280 LF 220 LF 160LF 150 LF 296 LF 22. LF 118 LF 120LF II4LF 1050LF 352LF Based upon these quantifies and the previously submitted prices, the cost for these ca'ossings is as follows: 6" SCH 40 PVC (op~) 6" SCM 40 PVC (bore) 2" SCH 40 PvC (open) 1050 LF at $8,00 per LF 280 LF at $24,00 per LF 352 I.,F a~ $3.50 per LF $8.400.00 $6,720.00 $1,232.0~! · Total $16,352.00 .erit SY":~'EBAU,G ZO '99 09:E~gAM KIMLEY-HORH FT WORTH1.; Aug-17 ~ 6:05PM; P~P.~4~E/3 ' Pagc 2 Sandy Lakc Roat Reconstruction Rc: Prices for TU El~tzic Crossings This work will require an additional twelve (12) cal~ndax days to complete, ffyou have any questions regarding this information, don't hesitate to contact our office. Sincerely, , ell 'on Company .... Robert D. Webcr Project Engineer Michael G. DeMotte, Kiml~r-Hom az~d Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AUg 20 '99 09:EgAM KIMLEY-HORM FT WORTH 'KIMLEY-HORN AND ASSOCI~I~ES, INC. 801 Cherry Street, Suite 1100 Fort Worth, TX 76102 K~A # 061087000 P. 5/6 Date: August 20:1999 CHANGE OR EXTRA WORK ORDER NO. 2 PROJECT DESCRIPTION: CONTRACT: OWNER: CONTRACTOR: ORIGINAL CONTRACT AMOUNT: CHANGE ORDER No. 1: CUR.RENT CONTRACT AMO~: Coppelt Sandy Lake Road Paving, Drainage, a.nd Water System Improvements ST 93-02 City of Coppell, Texas F~I Belt Construction Company $8,436,364.00 $20,300.00 $8,456,664.00 CHANGE OR EXTRA WORK TO BE PERFORMED Item Approx. Unit Decrease in Increase in 1 LS I LS 1 LS 280 LF 1,050 LF 360 LF Unit Description of Item Extend dxam liae from propen'y ~ to sowor Connect lateral ~to ewrm dr~l ~tall ~l~ut at pro~r~ I~e 6" Sch 40 PVC EI~. CoMuit - Bor~ 6" S~h 40 PVC ~. C~duit - ~n Cut 2" Seh ~ ~C EI~. Co~uit - O~n Price Contr. Price Contr. Price $1,125.0o $1,125.00 $2,20O.00 $2,200.00 $1,200-00 $1,200.00 $24.00 $~ $8.00 $3.50 $1,260.00 Total Increase in Contract Amount Total Decrease in Contract Amount Net Increase (Decrease) in Contract Amount Revised Contract Amount Original Contract Time Change Order No. 1 Net Increasel(Decrease) in Contract Time of Completion Revised Contract Time of Completion $0 $20,905.00 $8,477,569.00 850 Days _ 14 Days _ 12 Days _ 876 Days ._ AUg ZO '99 09:Z9AM KIML~-HORM FT WORTH 'Recommended by Kimley-Horn and Associates, Inc. Accepted by Contractor By, Approved by Owner By Distribution 1 - Owner I - Contractor 1 - KHA Office