Sandy Lk Cross L3-CS 881031 f~ ~ COPPELLNE~4ORANDui~PUBLIC NORKS
October 31, 1988~
TO: Shohre Danesh~nd, Civil Engineer ~\
On the wate~plans, they n~ed to
connection 1" and over in size to be detailed
device.
to show a double ~check
If you have any questions regarding this matter, please advise.
HLr/bb
cc: Steve Goram, Director of Public Works