Loading...
ST8402-CS 890426M.r. Russell Doyle, P.E.~ I~ ~;/.~/l'~ c ty of coppell \% ,7 P.O. · Cop~4, TX ~ -- ~ ~,L~6~ ' Denton Tap Road Improvements from ~ ~ ~Lake Road ~~e:[~ Excavation west o~enton Tap Road at Parkway Blvd. Dear Mr. Doyle: In response to your April 19, 1989 Handwritten Memorandum, copy attached, we dispatched our project representative to observe the situation and then report back on what he observed. The excavations are confirmed to be part of a Coppell C.I.P. project, the Crosstown Waterline, and have been excavated to install a bored casing pipe beneath the roadway for the 16" diameter waterline being extended across Denton Tap Road and Parkway Blvd. under the C.I.P. project. Upon completion of the crossing; installation, backfilling and compaction will be closely monitored by C.I.P. project representatives to assure compliance with plans and specifications. Additionally, as-built plans of the installation will be placed on file with the City of Coppell at the final close-out of the C.I.P. project. Should there be apparent failures of subgrade and/or pavement in this area in the future, this documentation will enable you to determine which Contractor's maintenance bond and warranty should be called into effect for repairs. If you have any questions, please call me. sincerely, John C. Karlsruher, P.E. Project Engineer JCK/dsp cc: H. Wayne Ginn, P.E. Gabe Favre Steve Goram Randy Fleming File 379 17103 Preston Road · Suite 100 · LB II8 · Dallas, Texas 75248 · ]'hone 214/248-4900