ST8402-CS 890406COPPgLL PUBLIC WORKS
April 6, 1989
TO:
FROM:
RE:
Dana Kamp, Sign/Signalization Technician
Steve Goram, Director of Public Works
Bridge Markings at Denton Creek and Cottonwood Creek
Dana, there has been a request made to look into the existing
bridge markings at the above referenced locations as well as the
center striping of the road. The comment was that it is difficult
to negotiate these at night.
Please review this situation, taking into consideration that this
is a construction zone where either some or all of this may fall
under the contractor's responsibility.
Please provide a response by April 18, 1989. Thank you.
SGG/sm