Loading...
ST8402-CS 890403UNIVEST DEVELOPMENT COMPANY April 3, 1989 Mr. Russell Doyle, P.E. City of Coppell P.O. Box 478 Copbell, Texas 75019 Re: Median Openings and Left Hand Tum Lanes - Denton Tap Construction Dear Russell: I received a copy of John Karlsruher's letter of March 17, 1989 regarding the referenced construction. According to Jerry Parche', you need a commitment for that portion of the cost of the construction proposed under the change order which is attributable to the Parks of Coppell Joint Venture. I have attached a copy of the cost breakdown which I understand was provided by John Karlsruher. You may consider this letter as the commitment of the Parks of Coppell Joint Venture to reimburse the City of Coppell for up to $9,547.60; being the estimated amount of the following construction cost; 1. 100% of the cost of constructing the south bound left-hand turn lane at station 178+17.77; which we understand to be lhe future intersection of Denton Tap road and Ihe proposed Center Plaza Boulevard to the east which is a part of the Coppell Health Center Plat, and future Mills Land 1o the west of Denton Tap. 2. One half of the cost of constructi~)n a median opening at station 182+44. 3. One half of the cost of construction a median opening at station 186+98. If you need any further information from me please do not hesitate to call. (;~,~ ~,~ UNIVEST FINANCIAL CORP. · ALLEN EQUITIES INC. 12770 COlT RD. · SUITE 1215 · DALLAS, TEXAS 75251 · 214/233-5771 Yours very truly, PARKS OF COI=PELL JOINT VENTURE By: Michael R. Allen Enc. cc John Kidd Glen Hinckley Jerry Parche' John Karlsruher Jay Chester RD/MA/4.3.89