ST8402-CS 890317GINN, INC. March 17, 1989 Mr. Michael R. Allen, President Univest Development Company 12770 Colt Road, suite 1215 Dallas, Texas 75251 CONSULTING ENGINEERS Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek, Coppell, Texas. Dear Mr. Allen: At the request of the City Engineer, Mr. Russell Doyle, I am writing this letter to inform you that Change Order No. 2 for the subject project, covering the additional median openings and left turn lanes requested by Univest Development and ABQ Development were not approved by the Contractor, and therefore was not considered for approval by the City Council at their February 28, 1989 meeting. A copy of the Contractor's February 27, 1989 letter is attached for your reference. After reviewing both the Contractor's request for revision of the Change Order, and his Contract with the City of Coppell, we have determined that he is within his rights under the Contract to request pricing other than the Contract Unit Prices for work added to the Contract. The basis of his claim is that this is new work being added to the scope of work of the Contract, as opposed to an error in estimated quantities, which would have been covered by the existing Contract Unit Prices provided the error did not constitute more than a 20% deviance in the bid quantities for a major item. We have also determined that his proposed price for the "hand work" is reasonable for this type of work. In fairness to all parties concerned, we have revised proposed Change Order No. 2 to allow the Contractor to perform the required "hand work" placements of 8"-3000 psi reinforced concrete for the subject median openings and left turn lanes at the new unit price of $ 16.68 per Square Yard, as measured in place. Any of the concrete placements for the subject median openings and left turn lanes which are done by slip-form methods will be paid for at the existing Contract Unit Price of $ 13.68 per Square Yard. The total costs shown in the attached Cost Estimates and Summary and Distribution of Construction Costs are based on the $ 16.68 per S.Y. unit price. However, since the Contractor may use slip- form methods to place a substantial amount of the concrete required for the subject median openings and left turn lanes, the final costs may be somewhat lower than those shown. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 It is our intention to have this Change Order no. 2 placed on the April 11, 1989 City Council Agenda for their approval. If you have any questions, please contact Mr. Doyle at (214) 462-0022. Sincerely, Project Engineer attachments CC: Russell Doyle, P.E., H. Wayne Ginn, P.E. Kevin Peiffer, P.E. J-379/280 City Engineer J379C02 DENTON TAP ROAD IMPROVEMENTS from SANDY LAKE RD. to DENTON CREEK ESTIMATED COST OF ABQ DEV. AND UNIVEST DEV. REQUESTED MEDIAN OPENING AND LEFT TURN LANES 3 - 17 - 1989 CHANGE ORDER NO. 2 STATION 178+17.77 - SOUTHBOUND LEFT TURN LANE FOR UNZVEST DEV. C1001 STORAGE) iTEM I DESCRIPTION I UTS ] OUANTITY I UNIT PRICE ~ AMOUNT BASE BiD 6 LANE PAVEMENT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation IcY PLace Topeoti - Median (6" thick) IsY Broadcast Seeding (Co~on Berm) lsY Lime treatment, met. in place ISy Lime eLurry, Ty A., 5X 22.5 #/Dy ITOH Lime sLurry, Ty A., 5X 34 #/ay (9" Thick) ITON 8" conc. pavement 3000 psi JSY 6" HonoLithic Curb (3000 psi) JiF 8" conc. pavement 3000 psi (non-stipform) IsY 6N conc. (Drfveuaye & Hedian Noses) IsY 6"x6" JiggLe Bar (refi.)CType 1-C) lEA 4' Traffic Button, Vhite(Non-NefL.)(p-?-V) EEA 4" Traffic Button, Vhtte(sing.-RefL.)CP-15-~) rEA 2" PVC conduit (ach. 40) ILF 3# PVC conduit (ach. 40) ILF 4' PVC conduit (ach. 40) ILF PuLLboxee lEA 29.9 -147.09 -147,09 179.48 0 3.05 0 15.14 179.41 -32.31 10 0 0 -7.24 '7.24 0 S6.60 $0.50 S0.42 S1.05 $67.00 $63.00 $13.68 $1.00 516.68 $24.00 $5.00 $2.00 S6.00 $2.40 $3.00 S3.~3 S127.00 S197.34 (S73.55) CS61.78) S188.45 S0.00 $192.15 S0.00 S15.14 S2,992.56 (S775.44){ S50.00 $0.00 SO.O0 (S34.75) (521.72) ($27.01) $0.00 SUBTOTAL $2,641.40 STATION 182+44 -NEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM I DESCRIPTION BASE 81O 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 RoadHay Excavation ICY PLace Topsoil - Median (6" thick) lay Broadcast Seeding (Common Berm) lay Lime treatment, mot. in place Lime slurry, Ty A., 5~ 22.5 #/ay ITON Lime slurry, Ty A., 5X 34 #/ay (9# Thick) ITDN 8" conc. pavement 3000 psi IsY 6" MonoLithic Curb (3000 psi) 8" conc. pevement 3000 psi (non-siipform) 6" coflc. (Driveways & Median Noses) lay 6,x6, JiggLe Bet (reft.)(Type 1-C) lEA 4" Traffic Button, ghite(gon-RefL.)Cp-?-U) lEA 4# Traffic Button, Whlte(eins.-Refi.)(P-15-V) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (ach. 40) ILF 4" PVC conduit (ich. 40) ILF Puliboxee iEA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 181.2 58.57 0 -16 -16 119 119 119 $6.60 $0.50 S0.42 S1.05 $67.00 $63.00 $13.68 $1.00 S16.68 S24.00 $5.00 $2.00 S6.00 S2.40 S3.00 $3.~ $127.00 S188.30 I ($119.90)I (SLOO.71)I S176.26 I so.oo I S179.55 I so.a0 I cs179.84)1 S3,022.42 I $1,405.68 } so.oo I C532.00)1 (596.00)I 5285.6o I S357.00 { S443.87 I 5508.00 { SUBTOTAL $6,038.23 J37gC02 STATION 182.44 - NORTHBOUND LEFT TURN LANE FOR ABG DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 BASE BID 6 LANE PAVEMENT I Roaduay Excavation icY IPLace Topsoil - Median (6" thick) laY Broadcast Seedtng CCommon Berm) IsY !Lime treatment, mat. in place lay Lime slurry, Ty A., 52 22.5 #lay ITON Lime slurry, Ty A., 52 34 #/ay (9" Thick) ITOH 8" cont. pavement 3000 psi lay 6" Monolithic Curb (3ooo psi) ILE 8" cont. pavement 3000 psi (non-slJpform) laY 6" conc. (Oriveuaya & Median Noses) lay 6"x6# Jiggle Bar (refi.)(Type 1-C) lEA 4" Traffic Button, UhJte(Non-Reft.)(P-Z-U) lEA 4" Traffic Button, Uhtte($ing.-Reft.)(P-15-u) lEA 2" PVC conduit (ach. 40) ILF 3" PVC conduit (Sch. 40) ILF 4" PVC conduit (Sch. 40) ILF Puliboxea lEA 33.44 -226.87 -226.87 200.68 0 3.41 0 -44.7 200.61 26.26 10 0 0 0 0 0 0 S6.60 $0.50 $0.42 $1.05 S67.00 S63.00 $13.68 $1.00 S16.68 S24.00 S5.00 S2.00 $6.00 $2.40 S3.00 S3.~ S127.00 S220.70 (S113.44)1 ($95.29)l S210.71 SO.O0 S214.83 so.aa (S44.?0)1 S3,346.17 S630.24 $50.00 SO.O0 SO.O0 $0.00 S0.00 $0.00 $0.00 SUBTOTAL $4,419.24 STATION 186+98 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT I 110 160 164 260 264 26~.1 360.1 360.2 360.6 530.1 6?2 676.1 676.2 618.1 618.2 618.3 624 BASE BID 6 LANE PAVEMENT I IRoaduay Excavation lCY PLace Topsoil - Median C6# thick) lay Broadcast Seeding (Common Germ) lay Lime treatment, mat. in place iSy Lime slurry, Ty A., 52 22.5 #/ay ITOU Lime slurry, Ty A., 52 34 #/sy (9" Thick) ITON 8" conc. pavement 3000 psi lay 6" Monolithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-stipform) 6" conc. (Drfveuaya & Median Noses) laY 6"x6" Jiggle Bar (refL.)CType 1-C) lEA 4" Traffic Button, Uhite(Non-Refi.)(P-7-U) lEA 4. Traffic Button, Uhlte(aJng.-Refi.)(P-15-V) IEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (ach. 40) ILF 4" PVC conduit (Sch, 40) JLF PuLLboxes iEA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 181.2 58,57 0 -16 -16 119 119 119 S6.60 S0.50 S0.42 S1.05 S67.00 S63.00 S13.68 $1.00 S16.68 S24.00 S5.00 $2.00 S6.00 S2.40 $3.00 S3.~3 S127.00 I S188.30 I (S119.90)I ($100.71)I S176.26 I so.aa I s179.55 I $o.oo I (S179.84)I S3,022.42 I Sl,405.68 I SO.O0 I ($32.oo)I (s96.oo)1 S285.60 J s357.oo I s443.87 I ssos.oo I SUBTOTAL $6,038.23 J379C02 STATION 186+98 - NORTHBOUND LEFT TURN LANE FOR ABQ DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT BASE BID 6 LANE PAVEMENT I 110 160 164 260 264 26&.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation icy PLace Topsoil - #edian (6" thick) lay Broadcast Seeding (Common Berm) lay Lime treatment, mat. Ln piece lay Lime slurry, Ty A., 52 22.5 #/ay ITON Lime slurry, Ty A., 5Z 3& #/ay (9" Thick) ITOH 8" conc. pavement 3000 psi IsY 6" #onoLLthlc curb (3000 psi) ILF 8" conc. pavement 3000 pal (non-siipform) laY 6" conc. (Driveways & Median Noses) 6"x6" JiggLe Bar (refi.)(Type 1-C) lEA 4" Traffic Button, Uhtte(Non-Refi.)CP-7-W) lEA 4'* Traffic Button, Vhite(atng.-Refi.)(P-15-U) lEA 2" PVC conduit (ach. 40) ILF 3" PVC conduit (ach. 40) ILF 4" PVC conduit (ach. 40) ILF PulLboxes lEA 33.44 -226.87 -226.87 200.68 0 3.41 0 -44.7 200.61 26.26 10 0 0 0 0 0 0 $6.60 $0.50 S0.42 S1.05 $67.00 $63.00 $16.68 S1.00 S16.68 $24.00 $5.00 S2.00 $6.00 S2.40 $3.00 S3.73 $127.00 $220.70 ($113.44) ($95.29) $210.71 S0.00 S214.83 $0.00 ($44.70) S3,346.17 $630.24 $50.00 S0.00 $0.00 S0.00 $0.00 $0.00 $0.00 SUBTOTAL S4,419.24 STATION 195.28 - MEDIAN OPENING AND LEFT TURN LANES FOR ABQ DEV. ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT IBASE BID 6 LANE PAVEMENT I 110 ]Roaduay Excavation IcY 160 IPtace Topsoil - #edLan (6" thick) IsY 164 IBroadcast Seeding (Common Berm) IsY 260 ILJme treatment, mat. In place IsY 264 ILIme slurry, Ty A., 5Z 22.5 #/ay ITON 264.1 ILIme slurry, Ty A., 5X 34 #/ay (9" Thick) ITON 360.1 J 8" conc. pavement 3000 psi ISY 360.2 16" MonoLithic Curb (3000 psi) ILF 360.6 I 8" conc. pavement 3000 psi (non-siJpform) IsY 530.1 I 6" conc. (Driveways & Median Noses) 672 16"x6" JiggLe Bar (refL.)CType 1-C) lEA 676.1 I 4" Traffic Button, WhJteCNon-Refi.)CP-7-U) lEA 676.2 14" Traffic Button, VhlteCaing.-Reft.)CP-15-~) lEA 618.1 I 2# PVC conduit (ach. 40) ILF 618.2 I 3# PVC conduit (Sch. 40) ILF 618.3 I 4" PVC conduit (ach. 40) ILF 624 IPuLtboxes IEA 82.17 -545.49 -545.49 479.78 3.39 3.03 0 -210.72 492.96 52.52 18 -16 -16 111 111 111 4 $6.60 S0.50 $0.42 $1.05 S67.00 S63.00 S13.68 S1.00 $16.68 $24.00 $5.00 $2.00 $6.00 $2.40 $3.00 S3.73 $127.00 $542.32 ($272.75) ($229.11) $503.77 S227.13 S190.89 S0.00 (S210.72)J $8,222.57 Sl,260.48 s9o.o0 ¢s32.oo)1 ($96.00) S266.40 S333.00 S414.03 S508.00 SUBTOTAL $11,718.02 J379C02 SUN#ANY ANO OISTNIBUTION OF CONSTRUCTION COSTS: #EDIAN OPENINGS: STATION 182+4& STATION 186*98 STATION 195~28 SUBTOTAL HEDIAN OPENINGS LEFT TURN LANES: STATION 178+17.?? STATION 182+44 STATION 186+98 STATION 195+28 NORTH BOUND STATION 195+28 SOUTH BOUND SUBTOTAL LEFT TURH LANES ABO DEV. UNIVEST DEV. TOTAL S3,019.12 S3,019.12 S6,038.23 S3,019.12 S3,019.12 S6,038.23 s4,235.61 s0.00 s4,235.61 $10,273.84 S6,038.23 S16,312.07 S0.00 $2,641.40 $2,64t.40 $4,419.24 $0.00 S4,419.24 S4,419.24 SO.O0 S4,419.24 S3,986.54 $0.00 $3,986.54 S3,495.88 S0.00 S3,495.88 $16,320.90 $2,641.40 $18,962.31 TOTAL ESTINATED CONSTRUCTION COST $26,594.74 S8,679.63 $35,274.37 ENGINEERING, TESTING AND IHSPECTION ~ lOX S2,659.47 S867.96 $3,527.44 GRAND TOTAL S29,254.21 S9,547.60 SI8,801.81 FE[IRUARY 2'7. 1989 GINN.. ZNU. , C[]N~31Jt_'f ].'7 1 05 PRESTOI', F(OAD SUITE 100. ~.l.~-i~ DALLAS, TEXAS 7524R d OHN C. t'"ARL u~FdJtlt::R E. lAP Ih.h']F. I'll [OJ[~MEN FROM SANDY LAKE' TO DENTON CREEl,. L. t.I, LACY NI:LL AGREE~ -l'/] EIlANGE ORDER 2. PROVIDED []INN, INC., AND 'THE CITY OF COF'I)[(LL WII .... A[~RE.E 'to THE FOLLOWING. 1) AR YOU S'FATED IN YOiJFt ._ET'rSR. THIS CHANGE ORDER INCREASES THAT .... INCREA~ED S~OPE OF WORK IS aN .... L,ALCULAFED BY ESTIMAI'ED DOLLAR VO~.UMES ~,.',,' OF THE CHANGE ORDER. FOR TH~S INCREASED'> LACY NEEDS lO CALENDAR DflYS ADDED TO : · ! :'.' THE SCOPE CF WOR INCF~EA~-~E IlF .~. ~.,~ Y.. ON THE r:AI]E OF WORK .... T'H[~ CONIFA..T TIME. THIFi INCREASL:i,D SCOPE OF HORK ALSO CHANGES THE SCOPE OF WORK F[1R ]I-IE L. ,-,. LACY COMPANY. OIJR INITIAL. BID PRICE': FOR TI'l(' ITEM ,-:~60. :t (8" CE]NC'. PAVEMENT 5000 (:'SI) IS BASED ON RATIO OF MACHINE WOI?IC TO HAND WORK. THIS RATIO HAS BEEN AFFECTED APPRECIABLY, AND ,.. H. LACY I'.I~{EDS ~3.00/SY ADDITIGNA[., OR t4 UNIT PRICE 01= '[16.68)SY, 'FOR THE 1456~SY ,':.-Af)I)ED t]Y 'rtllS CHANGE ORDER. -fHIS IS AN APP~OXIMATE $4L50~ .... (('¢)'NCRr:'ASF' OVER WHAT IS NOW SHOWN'ON THE.." CF ANGE ," 'ORDER. ', ',. ~,~ CUMF'ANY F.'EELS THIS A FAIR, AND EDUITA¢~LE ~RRANGEME:NT FOR ~I:.L Ir-'AFCFIES ~NVOLVED. ' ~F WE CAN .AGREE ON TEIE '.-,r~,JO CON I}I] [[')N'~} STATED A£fGVE:,. 'CI-IANGE ' OF(DI:-.R. ~FI. NDENI.E LACY ,10888 Shad' ~,].~,. ~,, . P.O: - Dall~is, T~a~ 753