ST8402-CS 890308The City With A Beautiful Future
March 8, 1989
P.O. Box 478
Coppell, Texas 75019
214-462~0022
Mr. Glen A. Hinckley
Univest, Inc.
12201 Merit Drive
Suite #170
Dallas, Texas 75251
I am in receipt of the attached request. There were no enclosures, please
forward. Presumably the exhibit will better define the request and the
terms "turn in","curb cut", and the alluding to "formerly there was a
drive opening". Also the cost of $500.00 appears to be very minimal, and
where did you receive that information.
Mills Lane is not an identifiable public street. There only exists
Parkway Boulevard, Sandy Lake Road and the most recently platted Coppell
Plaza Drive in this area. So any references or documentation you can
provide will assist us in reviewing your request.
Please feel free to let either Shohre Daneshmand, Civil Engineer, or
myself know if you have any questions. Thank you.
RRD/lsg
Attachment
xc:
Shohre Daneshmand, Civil Engineer
Dale Jackson, Building Official
Steve Goram, Public Works Director
HINCKLEY
February 17, 1989
ENTERPRISES, INC.
Mr. Russell Doyle, City Engineer
City of Coppell
P. O. Box 478
Coppell, Texas 75019
RE: Driveway Turn-in and Curb-Cut at
Denton Tap at Mills Lane
Dear Mr. Doyle:
On behalf of Belt Line 4.5 Joint Venture, and after a
conversation with Wayne Ginn, I am writing this letter to
request that the City arrange for construction of a
turn-in and curb-cut at Denton Tap Road, fronting the
property at the location shown on the attached Exhibit.
Formerly, there was a drive opening to Denton Tap Road.
We will reimburse the City for the cost of this
construction, which I understand to be approximately
$500.00. Prior to finalizing the City's commitment for
this construction, please advise me of the exact cost of
this construction and the basis on which payment is
required.
Please call if you have any questions.
Very truly yours,
UNIVEST ENTERPRISES, INC.
Glen A. Hinckley
Manager, Belt Line 4.5 Joint Venture
GAH/Jc
Enclosures
cc: Mr. Joe C. Hinckley
REAL ESTATEINVESTMENTS