Loading...
ST8402-CS 881222 (2)GINN, December , 1988 CONSULTING ENGINEERS Mr. Davi~ Snyder, 10888 P.o. Tap Road Improvements from Sandy ~ke Ro Dear Mr. ~az~e~ ~o~a~, ~ han~ ~e~e~e~ ~ ~e~ o~ ~he zev~e~ D~a~ng~ ~n ~be ao~o~p~n~ng Dza~ng ~ ~h~h ~e~eo~ ~be ~o~o~ng: · . ~e~e~gn o~ the ~ga~on ~onneo~on~ an~ ~he a~t~on o~ ~z~g~on ~ee~e~ ~o~ ~o~e~ an~ ~on~zo~ ~z~ng between ~e~n~ an~ ~be ou~e ba~ o~ ~u~b a~ ~he ~ooa~on~ ~n~oa~e~. 2. Addition of 2" PVC Conduits for future street lighting and traffic signal installations. 3. Addition of double 3" PVC Conduits at the Parkway Blvd. intersection for the future traffic signal installation. This work is to be accomplished in accordance with the existing unit prices in the Contract with the exception of the double 3" and the single 4" Schedule 40 PVC Conduit. The 4" conduit will be installed as Pay Item 618.3 at the unit price of $3.73 per lineal foot as proposed in your November 28, 1988 letter, copy attached. The double 3" conduit will be covered at a later date when a unit price has been agreed upon. Please insert the revised Drawings transmitted herewith in your construction sets and remove their previous counterparts from the project site. As you.can s~e from~lt~h~d tabulation, this Field Change %~.~estlmated t.~.nc~eas~e Estimated Contract Price by ~59%.20~. Payment wil~sed on the actual quantities of ma~l~ ~nstalled. If-you have any questions please call me. attachments cc: Ginn, P.E. Randy Fleming j379 (j379fcS) 17103 Preston Road · Suite 100 · LB 118 · Dalla& Texas 75248 · Phone 214/248-4900 Sheet No. 3 22 23 24 25 26 27 28 29 DRAWING LI6T DENTON TAP ROAD XMPROVEMENT6 FROM SANDy LAKE ROAD TO DENTON CREEK FIELD CHANGE NO. Description Sheet Index and SummarM of Quantities Drainage Sra. 166+58 to 199+00 Drainage Sta. Drainage Sta. Drainage Sra. Drainage Sta. Drainage Sta. Drainage Sta. Drainage Sta. 169+00 to 174+00 174+00 to 179+00 179+00 to 184+00 184+00 to 189+00 189+00 to 194+00 194+00 to 199+00 199+00 to 204+00 Revision 4 1 2 2 2 3 4 4 & 5 2 TABUL~T'FON - FIELD CHAN(~E NO o 5 'rTEM UNTT CHANGE TN CHANGE TN NO . DEHCRTPTION pRICE QUM%qTTTy COfJT 582.4 Irrigation $848.00 (2) ea ($1,696.00) connection 618.1 2" PVC conduit $ 2.40 2,062 if $4,948.80 (Sch. 4O) 618.2 3" PVC conduit $ 3.00 307 if $ 921.00 (Sch. 40) 618.3 4" PVC conduit $ 3.73 380 if $1,417.40 (Sch. 40) TOTAL CHANGE IN ESTIMATED CONTRACT PRICE $5,591.20 L~UNII.~/.tI:I'[)I;:: L. H. L./-IC-Y THE Pf~J. CE TO USf:..;z" COPPER t:LJl'( IHE ftBLIVE I~:E:F. EI~F,~ENCEi) ):I'EHS 1) NO SCHEDULE ~0 PVC SL-EEVE~ 2" COI~I~Ef"-" "*~ ' '10 BE JtLIIklED IL)[f;~ECI'. ] F,~F'{ 1 GA'I' 1 ON CONNE(:'I t>RU,J~] I G/9 ,.~8.:., 4 l I~Ft ] (.iA"f 1 (LIN IHE F'R,I;L.;E FI. IR 4" PVf:: (.:L]Ni)IJ.['I' FI)J< EJ'rHER F'RL%.IECT 214/3574)146 10888 ShadyTrail'. P.O. Box541297 Dallas, Texas 75354-1297