Devonshire 2-CS 920925The City With A Beautiful Future
P O. Box 478
Coppell, Texas 75019
214-462-0022
September 25, 1992
Mr. Steve Gee
G Development Group
8445 F~¢epo~, Suiie 21~
!~rv4ng~ ~:Texas 75063
RE: DEVONSHIRE ADDITION - PHASE II
Dear Mr. Gee:
A final inspection of the above referenced project has been confirmed by representatives of the
City of Coppell subject to various maintenance agreements.
The drainage utility and paving has been verified and is in compliance with the City of Coppell
standard requirements. Erosion protection will also be maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of this letter (September 25, 1993).
Maturity on the Erosion Control Bond will be two years from this letter (September 25, 1994).
Sincerely,
°/
Larry Davis
Construction Inspector
LD/lsg
XC:
Steve Goram, Director of Public Works ·
Kenneth M. Griffin, P.E., City Engineer
M. Shohre Daneshmand, P.E., Civil Engineer
Greg Jones, Acting Building Official
Bill Jones, L.H. Lacy Company
Darrell Fagile, Wright Construction Company
devon, ld