Loading...
Devonshire 2-CS 920813 (2)COPPELL PUBLIC WORKS DATE TO: FROM RE: Howard L. Pafford, Utilities Superintendent' ] ' Walk-through of Devonshire Estates Phase II Field personnel completed a walk-through of the above referenced project and have found the following items to be deficient at this time. Sra. 8+04.19 - Regrout and wipe inside manhole and ring. Main line water valve at front of project needs to be cleaned out. Sra. 3+98.03 - Regrout and wipe inside manhole and rings. Lot 56 - Reset meter can Lot 54 - Reset meter can Sra. 1+28.00 - Regrout and wipe inside manhole and ring Sra. 9+93.00 - Same as above Need chimney seals (interior) on all manholes in new section Please ensure that each of these items are corrected prior to acceptance of this project. HLP/dm DEVNSHII.HLP