Devonshire 2-CS 920813 (2)COPPELL PUBLIC WORKS
DATE
TO:
FROM
RE:
Howard L. Pafford, Utilities Superintendent' ] '
Walk-through of Devonshire Estates Phase II
Field personnel completed a walk-through of the above referenced
project and have found the following items to be deficient at
this time.
Sra. 8+04.19 - Regrout and wipe inside manhole and
ring.
Main line water valve at front of project needs to be
cleaned out.
Sra. 3+98.03 - Regrout and wipe inside manhole and
rings.
Lot 56 - Reset meter can
Lot 54 - Reset meter can
Sra. 1+28.00 - Regrout and wipe inside manhole and ring
Sra. 9+93.00 - Same as above
Need chimney seals (interior) on all manholes in new
section
Please ensure that each of these items are corrected prior to
acceptance of this project.
HLP/dm
DEVNSHII.HLP