Loading...
ST8402-CS 881123TO: SUBJECT: HANDWRITTEN MEMORANDUM MESSAGE: FROM: ~VSS /....QO},//--~'' DATE: //--.2~'-~' z2~r.~-~ / )- IO~Y~y' GINN, INC. CONSULTING ENGINEERS November 10, 1988 Mr. Russell Doyle, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Improvements Creek, Coppell, Texas. from Sandy Lake Road to Denton Dear Mr. Doyle: As a part of the effort to get the Parkway Blvd. improvements underway, the city of Coppell had agreed to include the western portion of the Denton Tap Road/Parkway Blvd. intersection in the construction of the Denton Tap Road Improvements. It is our intention to revise the plans to include the western part of the intersection up to the ends of the curb returns as marked in red pencil on the attached print. As with the median opening requested by ABQ Development, this work can be included in the scope of our work covering overall design of the project. If agreeable to you, we will then issue a field change for the work to accomplished by the Contractor under the existing unit prices in the Contract. If you have any questions, please feel free to call me. S~.~re~y, / John C. Karlsruher, P.E. Project Engineer Enclosure cc: H. Wayne Ginn, P.E. File J-379 A:J379PKWY 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900 "'2700 Jerry Parch Consulting Engineers October 29, 1988 Mr. John Karlsruher, Ginn, Inc. 17103 Preston Road Suite 100, LB 118 Dallas, Texas 75248 214/248-4900 P.E. RE: JP No. 88009; Denton Tap Road; Parks of Coppell; Coppell, Texas Dear John: Pursuant to your request, enclosed is a drawing showing the geometrics of the westerly turnout for Parkway Boulevard at the intersection with Denton Tap Road. Distances are provided based on location of ABQ property corners following dedication of additional Right-of-Way, i.e. point numbers 454 and 462, at the north and south ends of ABQ's frontage on Denton Tap Road. Design of the turnouts is based on our surveyors location of the centerline of existing Parkway Boulevard on the east side of Denton Tap Road and your construction plans for Denton Tap Road through the intersection. Our surveyors located the nails in the Right-of-Way that were apparently set sometime ago (prior to construction) on the roadway centerline for the PC and PT of the 5729.70 ft. centerline radius curve in Denton Tap Road. However, we adjusted the location of these points generally 0.2 ft. to the north in order that the radius and delta of the design curve remain valid with our geometry. Therefore, if the location of the centerline PC and PT was preserved, they should not be used for staking the proposed Parkway Boulevard turnout. I would suggest using ABQ property corners for construction staking of the proposed Parkway Boulevard t~rnout. Please notify me if our surveyors can provide any assistance. I hope that the information presented on the attached drawing is sufficient for preparation of construction drawings for the proposed Parkway Boulevard turnout. However, if you need additional information, please call. Please advise us of the westerly limits of this turnout once they are determined and provide us a copy of the completed design when available. 6001 V,/. Interstate 20, Suite 209. LB 32 · Arlington, Texas 76016 · Metro (817) 572-3458 · (817) 561-2108 Mr. John Karlsruher, P.E. October 29, 1988 JP No. 88009 Page 2 of 2 If we can provide further assistance, please call. Thank you. Sincerel~ ~Jerry Parche' , P.E. JP:ch Enclosure: Layout Sheet of Proposed Turnout cc: Mr. Jay Chester, P.E./ABQ Development Corporation Mr. Russell Doyle, P.E./City of Coppell Mr. Jack Crawford, R.P.S./Brittain and Crawford COR£ ~ ITEM I00 ITEM /9O c¢ ON BY OTHERS