Loading...
Freeport NIP(8.0)-LR050426· CtlBCK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PW$ I.D. # LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY Manufactnr~r Mod~l Number S~iaI Number l~:luced Pre~sur~ Pr/nc/pie Double Check V~Ive 2 7' m lh~m~ Vacuum Bnml~ m Atmosph~'~ V~uum Br~ak*r REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACULrM BREAKIiR Double Check Valve Ass-mhly /~4~' 12ndCheck/-~ Relief Valve Airlnlet CheckVslve 1st Check Iui~al T,st DC-Closed Clos~l Tight ~ ~ at Op~ned at ~sid Tight ~ /Leak~l m psid psid tl~'..<~' PP- psid ~ 0 Did not Op~ m l.~ak~xt m Materials Used T~t ~ DC-Closed Closed Ti~t o Opened at Opted at psid R~air Tight o psid psid RP psid Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester~ Copy CHECK ONE: IRRIGATION '~'~' DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEM]~LY TF. ST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # OC^T O srmc : The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY Reduced Pressure Principle Double Check Valve Manufacturer m Pr~ma~ Vacuum Bmak~ u Am~osphcre Vacuum Bre~ak~r Siz~ ~ /~ REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAIO~R Double Check Valve Aar~mbly lstCheck~tl/ 2ndCheck/~:) RellefYalve AirInlet CheckVaDe Tight ~' a psid psid ~1 .SD' RP- psid Lcakcd c~ Did not Open m Le~k~ m Materials Used Te~t ~ DC-Closed Closed Tight m Opem~d at Ol~xi at psid R~air Tight m ~_~psid paid RP paid The above is certified to b~ lruc. Gauge # Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy