ST8402-CS 881005GINN,
October 5, 1988 ~'
Mr.-Glen~y
12201 ~it Drive, Suite 170
Da11~ TX 75251
CONSULTINg. ENGINEERs
Re: Denton Tap Construction Easement
Dear Mr. Hinckley:
Reference is made to our letter dated August 25, 1988 and
subsequent meetings regarding the temporary construction easement
along Denton Tap Road. We offer the following in addition to our
letter.
It appears that the high school platted a 24' wide strip from the
high school property to Denton Tap Road (referred to as Mills
Lane). It also appears that this strip is not dedicated as
public R.O.W. Mr. Jerry Parche (ABQ Engineers) is sending us the
boundary verification survey that establishes the south boundary
of ABQ property (north boundary of 24' Mills Lane). Upon
receipt, we will survey the 24' strip to its intersection with
Denton Tap Road. This will establish where the median opening
will be located. We will have the contractor construct the
median opening centered on the existing 24' Mills Lane. This
will accomplish the immediate need regarding the temporary
construction easement.
Jerry Parche is going to discuss the dedication of R.O.W. with
ABQ. After they have had time to consider it, we will suggest a
meeting with you, Dr. Stanfield, ABQ, and the other property
owners to resolve any potential conflicts.
If the entire R.O.W. is unobtainable at the time of platting your
property, we recognize that it may be necessary to construct one
half of a street to serve the high school and adjoining
properties until such time as the property on the north of Mills
Lane is platted and the additional R.O.W. secured. We know of no
reason not to support a request for a variance if required.
Paragraph 6 - Based on further discussion, the current
subdivision ordinances showing 50 feet in Figure 2 as the "A"
dimension would prevail.
Add Paragraph 10 - Fence. The fence is to be relocated prior to
the completion of the project to the future R.O.W. line.
We appreciate your willingness to allow the city to relocate the
fence and grant the temporary construction easement.
FO.-qWARDED TO
MAYOR AND ,COUNCIL
DATE: I0/! g./ -
17103 Preston l~oad · Suite I00 · LB IIg · I)allas, Tcxas 75248 · I'ho.c 214,~48-4~/00
It is our understanding that this fulfills your request and that
the temporary construction easement as granted is in effect.
Thank you for your cooperation in this matter.
Sincerely,
H. Wayne Ginn, P.E.
cc:
Alan D. ~Ratliff
Russel! Doyle
John Karlsruher
File 379