Loading...
ST8402-CS 870807GINN, INC. CONSULTING ENGINEERS August 7, 1987 A. V. Alme~ Dallas Wa~er Utilities 320 E. ~fferson Blvd., Rm. 211 Dall~ TX 75203 Re: Denton Tap Road Paving and Drainage Improvements Coppell, Texas Dear Mr. Almeida: In preparing engineering plans for the above mentioned project we have encountered some potential conflicts between your existing 30-inch water transmission line to Flower Mound, and our proposed paving and drainage improvements. We have enclosed two sets of preliminary plans for the proposed paving and drainage improvements for your use in determining which of your existing facilities must be either relocated, lowered, or protected in other ways ahead of the proposed construction of Denton Tap Road north of Sandy Lake Road. In your review of our plans you will see that we will have a conflict at stormsewer lateral number D-7 and also at the bridge widening location at Cottonwood Branch. We have also exposed the pipe in the proximity of paving station 185+00 where it appears that the cover provided by our future paving may be inadequate for your transmission line. I would like to meet with you at your earliest convenience to discuss a plan of action in determining how and when the proper relocations and lowerings can be completed in advance of our construction. We anticipate advertising this project for bid in September and beginning construction in late November.. We are currently designing the proposed construction sequence and, therefore, are in a position to try to accommodate the water line relocation/lowerings in the most reasonable manner. 17103 Preston Road · Suite IIX) · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Mr. A. V. Almeida, August 7, 1987 Page 2 We appreciate your cooperation with the City of matter. Sincerely, John C. Karlsruher, P.E. JCK/j c cc: Alan D. Ratliff, City ~. H. Wayne Ginn, P.E., City Engr. Coppell in this