Loading...
Eagle Point-CS 930921COPPELL PUBLIC WORKS MEMOI~tNDUM D~TE: TO: FROM: RE: September 21, 1993 Larry Davis, Construction Inspecto~ \~)1 Rey Gonzales, Streets Superintenden %~/ Eagle Point Walk Through - 9/21/93 This memorandum is to inform you of the deficiencies found at the above referenced project. Please insure that the contractor is made aware cf these and that you contact me with a follow up walk through time. The following was found; Seal curb expansion joints - silicone runs Remove stakes from alley headers(4 locations) Repair broken alley panel corners(3 locations) Mud ball holes, chips in curb joints Erosion at drop inlets Seal random cracks east end of alley @ Wilshire Trim redwood ears where required If you have any questions please let me know. RG/rg cc: Central File EAGLEWT.RG