Eagle Point-CS 930915COPPELL PUELIC WORKS MEMORANDUM DATE: TO: FROM: RE: Field personnel performed a final walk-through of the above referenced project this morning. Below I have listed those items that were /3. found to be deficient: 1 + 47.00 Line E - Manhole in street needs to be poured. Pebble Creek & Long Meadow - Main line valve in street needs poured. 0 + 00 Line E - Manhole needs poured in street, also check for inflow. Wilshire & Falls Road - Main line valve in street needs poured. Station #6 + 02.18 Line 6 - Manhole needs poured in street. Sta. #4 + 54.10 - Manhole needs poured in street. Falls Road & Long Meadow - Main line valve needs poured in street. Please ensure that each of these items are corrected prior to acceptance of this project. HLP/dm WALKTHRU.HLP/EAGLEPT.HLP