ST9505-CS 950908COPPELL UT~'L~T~'ES ~([~ ~'~
D&TE~
TO:
FROM:
RE:
September 8, 1995
Larry Davis, Construction
Howard Pafford, Utilities
Final Walk-Through for
spector
Drive
Utilities personnel performed a walk-thru on the above referenced
project yesterday morning and the following items were found to
be deficient; ~
*~//*All manholes need chimney seals and rainpans.
line valve at drainage channel needs valve
extension.
Manhole at Wrangler and Executive Dr. needs to be
raised to curb grade.
~/~d M.H. painted on curb for all manholes.
Please insure that each of these items are corrected prior to
release of this project.
HLP/hp
FAX COVER SHEET
UTILITIES DIVISION
732 Deforest Road
Coppell, Tx. 75019
(214) 304-3545
FAX # 304-3547
PLEASE DELIVER THE FOLLOWING PAGF.~ TO:
DIRECT DIAL:
DATE:
NUMBI~ OF PAGES (INCLUDING COVER
IF YOU i)O NOT RECEIVE ALL OF THE pA(~ES. PLEASE CALL BACK AS SOON AS
POSSIBLE, PLEASE DIAL DIRECT TO THE PERSON SENDING THIS FAX BY DIALIN~
THE DIRECT DIAL NUblBER LISTED. THANK YOU.
To:
From:
RE:
Date:
Howard Pafford, Utilities Superintendent
Per Birdsall, Interim Street Superintendent
Jeff Jones, Fire Marshal
Greg Jo~ing Official
Larry~a}il[t~eonstmction Inspector
FINAL WALK-THRU for Executive Drive
September 5, 1995
WORKS
A final walk-thru for paving and utilities for the referenced project has been scheduled for
Thursday, September 7, 1995 at 8:30 a.m.
If I can be of further assistance please let me know.
CC:
Dennis Chovan, Albert Halff & Assoc.
Bobby Foster, L.H. Lacy Co.
file/ldavis/0walkthm.mm
Dr',
er,,,-- a O u -i-~ r. .e -e
DATE:
TO:
FROM:
RE:
CoPPELL UTILITIES
September 8, 19q5
Larry Davis, Construction
Howard pafford, Utilities
Inspector n~
Superintende
Final Walk-Through for Executive Drive
Utilities personnel performed a walk-thru on the above referenced
project yesterday morning and the following items were found to
be deficient;
seals
Main line valve at drainage channel needs valve
extension.
. Manhole at Wrangler and Executive Dr. needs to be
raised to curb.~g~ade
~eedXZ~:~h~ed on curb for all manholes.
Please insure that each of these items are corrected prior
release of this project. ~
HLP/hp