Loading...
ST9505-CS 950908COPPELL UT~'L~T~'ES ~([~ ~'~ D&TE~ TO: FROM: RE: September 8, 1995 Larry Davis, Construction Howard Pafford, Utilities Final Walk-Through for spector Drive Utilities personnel performed a walk-thru on the above referenced project yesterday morning and the following items were found to be deficient; ~ *~//*All manholes need chimney seals and rainpans. line valve at drainage channel needs valve extension. Manhole at Wrangler and Executive Dr. needs to be raised to curb grade. ~/~d M.H. painted on curb for all manholes. Please insure that each of these items are corrected prior to release of this project. HLP/hp FAX COVER SHEET UTILITIES DIVISION 732 Deforest Road Coppell, Tx. 75019 (214) 304-3545 FAX # 304-3547 PLEASE DELIVER THE FOLLOWING PAGF.~ TO: DIRECT DIAL: DATE: NUMBI~ OF PAGES (INCLUDING COVER IF YOU i)O NOT RECEIVE ALL OF THE pA(~ES. PLEASE CALL BACK AS SOON AS POSSIBLE, PLEASE DIAL DIRECT TO THE PERSON SENDING THIS FAX BY DIALIN~ THE DIRECT DIAL NUblBER LISTED. THANK YOU. To: From: RE: Date: Howard Pafford, Utilities Superintendent Per Birdsall, Interim Street Superintendent Jeff Jones, Fire Marshal Greg Jo~ing Official Larry~a}il[t~eonstmction Inspector FINAL WALK-THRU for Executive Drive September 5, 1995 WORKS A final walk-thru for paving and utilities for the referenced project has been scheduled for Thursday, September 7, 1995 at 8:30 a.m. If I can be of further assistance please let me know. CC: Dennis Chovan, Albert Halff & Assoc. Bobby Foster, L.H. Lacy Co. file/ldavis/0walkthm.mm Dr', er,,,-- a O u -i-~ r. .e -e DATE: TO: FROM: RE: CoPPELL UTILITIES September 8, 19q5 Larry Davis, Construction Howard pafford, Utilities Inspector n~ Superintende Final Walk-Through for Executive Drive Utilities personnel performed a walk-thru on the above referenced project yesterday morning and the following items were found to be deficient; seals Main line valve at drainage channel needs valve extension. . Manhole at Wrangler and Executive Dr. needs to be raised to curb.~g~ade ~eedXZ~:~h~ed on curb for all manholes. Please insure that each of these items are corrected prior release of this project. ~ HLP/hp