Eagle Point-CS 930122COPPELL PUBLIC WORKS
MEMORANDUW
DATE:
TO:
FRO~4 :
HE:
January 22, 1993
Ken Griffin, ~
Public Works Staff~!l.~
Development Fees for Eagle Point Village
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
110 - 5/8" x 3/4"
Domestic Meter/s = __
Irrigation Meter/s = __
110 ESU's
ESU's
Total 110 ESU's ~ $650.00 ea = $ 71,500.00
100% due prior to Council approval of the final plat.
This assessment does not include irrigation impact.
Waetewater Impact (City)
110 - 5/8" x 3/4" Residential Meters = 110 ESU's
Total 110 ESU's @ $450.00 ea = $49,500.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
110 Connections ~ $100.00 each = $ 11,000.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
110 Connections @ $100.00 each = $11,000.00
100% due prior to issuance of building permit.
Development Fees
Page 2
utility Final Inspection Fee
110 lots ~ $50.00/lot = $5,500.00
100% due prior to issuance of building permit.
Water Meter Fee (Lots)
I10 - ~" x ~" Residential Meters @ $22.25 ea
100% due prior to issuance of building permit.
= $2,447.50
Water Meter Deposit
Residential 110 meters @ $30.00 ea = $3,300.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
110 Residential Lots at $150.00 each = $ 16,500.00
Units (Multi family) at $75.00 each = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Development Fees
Page $
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
DEVFEES.HLP
Development l~ees
Page 4
STREET SIGN ASSESSMENT
for Eaqle Point Villaqe
The following assessments being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 18 1,143.72
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 9 871.65
OTHER
No Outlet 63.54 I 63.54
Street Name w/pole 36.60 1 36.60
TOTAL $2,115.51
Cost breakdowns may be obtained from Public Works by written
request.
DEVFEES.HLP
Revised 12/15/92