Eagle Point-CS 930122COPPELL PUBLIC WORKS MEMORANDUW DATE: TO: FRO~4 : HE: January 22, 1993 Ken Griffin, ~ Public Works Staff~!l.~ Development Fees for Eagle Point Village The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 110 - 5/8" x 3/4" Domestic Meter/s = __ Irrigation Meter/s = __ 110 ESU's ESU's Total 110 ESU's ~ $650.00 ea = $ 71,500.00 100% due prior to Council approval of the final plat. This assessment does not include irrigation impact. Waetewater Impact (City) 110 - 5/8" x 3/4" Residential Meters = 110 ESU's Total 110 ESU's @ $450.00 ea = $49,500.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 110 Connections ~ $100.00 each = $ 11,000.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 110 Connections @ $100.00 each = $11,000.00 100% due prior to issuance of building permit. Development Fees Page 2 utility Final Inspection Fee 110 lots ~ $50.00/lot = $5,500.00 100% due prior to issuance of building permit. Water Meter Fee (Lots) I10 - ~" x ~" Residential Meters @ $22.25 ea 100% due prior to issuance of building permit. = $2,447.50 Water Meter Deposit Residential 110 meters @ $30.00 ea = $3,300.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee 110 Residential Lots at $150.00 each = $ 16,500.00 Units (Multi family) at $75.00 each = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Development Fees Page $ For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works DEVFEES.HLP Development l~ees Page 4 STREET SIGN ASSESSMENT for Eaqle Point Villaqe The following assessments being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 18 1,143.72 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 9 871.65 OTHER No Outlet 63.54 I 63.54 Street Name w/pole 36.60 1 36.60 TOTAL $2,115.51 Cost breakdowns may be obtained from Public Works by written request. DEVFEES.HLP Revised 12/15/92