Loading...
ST9505-CS 950908 (2)DATE: TO: FROM: RE: CoPPELL UTILITIES MEMORANDUM 1995 Construction Inspector September 8, Larry Davis, Howard pafford, Utilities Superintendent Final Walk-Through for Executive Drive Utilities personnel perfor]~ed a walk-thru on the above referenced project yesterday morning and the following items were found to be deficient; Main line valve a= drainage channel needs valve extension. ~ ~. Manhole at Wrangler and Executive Dr. needs to be raised to curb,grade. Please insure that each of these items are corrected prior to release of this project. 7, HLP/hp