January 28, 1998
Forezt Cove, phn~e I
Development Fee Asz~sment
Dear Mr Pope:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the mount of $136,010.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer m attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Michael A. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public Works
Greg lones, Chief Building Official
Gary Sims, Dir. Leisure Services
DI VELOPMENT FEE TABLE
Project: Forest Cove, Phase I
Date: 1/28/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $22,050.00 $22,050.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $2,250.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,062.16
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigafion/Fireline) $144.38
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,540.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $19,800.00 $19,800.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $2,200.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $2,200.00
(100% due at Issuance of Building Permit)
Park Fee $56,540.00 $56,540.00
(100% due prior to Council Approval)
Roadway Impact Fee $37,620.00 $37,620.00
(100% due prior to Council Approval)
Street Light Fee Infomaation not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
tOTAL $145,436.54
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $136,010.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Forest Cove, Phase I
DATE: 1/28/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
44 - 5/8 inch X 3/4 inch = 44
1 - 1 1/2inch = 5
Total #: 49 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 45 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 44 Domestic Meter(s) @ $24.14
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$144.38
Water Meter Deposit Fee (Domestic):
Total #: 44 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
44
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total 8: 44 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 44 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$22,050.00
$2,250.00
$1,062.16
$144.38
$0.00
$0.00
$1,540.00
$30.00
$19,800.00
$2,200.00
$2,200.00
Page 1
D,-¢ELOPMENT FEE WORKSHEE Y
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
44
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in tha City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will ba assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
$56,540.00
N/A
$37,620.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at t~is dine
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development conU~acts
Page 2
ROADWAY IMPACT FEE CALCULAI'IONS
PROJECT: Forest Cove, Phase I
DATE: 1/28/98
ROADWAY IMPACT FEE:
Service Area *
Category **
Land Use **
Bu~ai.~ size (sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles Hr Development Uni0 x (Fee per Vehicle Mile) =
5
Residential
Single-Family Detached
N/A
44
2.85
$300
$37,620.00 II
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)