Loading...
Forest Cove 1-PT 980407Bore/Excavation in Public Right-Of-Way Permit City of Coppe!l Date: /7 / Permit Issued To: Name: Adclress: - Public Works Department Phone: ~ergency Phone: ~e of work/General Demcription: Have ~i City and/or Franchise Utilities Been Contacted and Existinq Utilities Located: YES Will It Be Necessa_~y to Excavate Street, Pavement? YES (attach permit) Alley or Sidewalk Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. A~ea(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Work~ Departments prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PERI~!T Attach Barricading/Detour Plan if a lane or street closure applicable. Da~e is Franchise Inspector/or City Inspector ~~s Rep~-~s enua Cive Date Date - Applicant shall indemnify and forever hold harmless against each and eve~/ claim, demand or cause of action that may be made or come against iz by reason of or if any way arising out of the closure, blocking, excavating, cutting, ~unneling, or other work by the applicant under permit from the City, if such pe-~n, it is granted. PEP,MIT. PI[B Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. NOW ET BORES ALLOWED! ~