Forest Cove 1-PT 980407Bore/Excavation in Public Right-Of-Way Permit
City of Coppe!l
Date: /7 /
Permit Issued To: Name:
Adclress:
- Public Works Department
Phone:
~ergency Phone:
~e of work/General Demcription:
Have ~i City and/or Franchise Utilities Been Contacted and
Existinq Utilities Located: YES
Will It Be Necessa_~y to Excavate Street,
Pavement? YES (attach permit)
Alley or Sidewalk
Representative(s) of the Franchise/Contractor must adhere to all
construction standards approved by the City of Coppell, which
includes but is not limited to: Compaction of Trenches and Bores,
and Barricading according to the Texas Manual on Uniform Traffic
Control Devices. A~ea(s) affected must be restored to as good
condition as before the commencement of work.
Any excavation requiring closing of a street or alley must be
reported to the Police, Fire, and Public Work~ Departments prior
to closing (462-1144, 462-1133 and 462-8495).
Attach Work Order
(Franchise Only)
PAGE 2
PERI~!T
Attach Barricading/Detour Plan if a lane or street closure
applicable.
Da~e
is
Franchise Inspector/or City Inspector
~~s Rep~-~s enua Cive
Date
Date -
Applicant shall indemnify and forever hold harmless against each
and eve~/ claim, demand or cause of action that may be made or come
against iz by reason of or if any way arising out of the closure,
blocking, excavating, cutting, ~unneling, or other work by the
applicant under permit from the City, if such pe-~n, it is granted.
PEP,MIT. PI[B
Ail contractors will contact Public Works @ 462-8495 to have
trenches and/or open cuts inspected prior to back fill operation
taking place. Staff will be sent to inspect the project.
NOW ET BORES ALLOWED! ~