Loading...
Forest Cove 2-CS 990308COPPELL UTILITIES DIVISION DATE: TO: FROM: RE: March 8, 1999 Larry Davis, Construction Inspector Larry Smith, Utilities Division Follow-up Walk-thru Forest Cove III Listed below are Utility Division comments relative to walk thru. 1. All Utilities need to be exposed and brought to grade. Almost everything has been covered up and follow-up could not be done.