Forest Cove 2-CS 990308COPPELL UTILITIES DIVISION
DATE:
TO:
FROM:
RE:
March 8, 1999
Larry Davis, Construction Inspector
Larry Smith, Utilities Division
Follow-up Walk-thru Forest Cove III
Listed below are Utility Division comments relative to walk thru.
1. All Utilities need to be exposed and brought to grade. Almost
everything has been covered up and follow-up could not be
done.