Forest Cove 2-CS 980701COPPELL UTILITIES DMSIO~
DATE:
TO:
FROM:
RE:
July 1, 1998
Larry Davis, Construction Inspector
Larry Smith, Utilities Division
Walk-thru Forest Cove II, June 30, 1998
Listed below are Street Division comments relative to walk thru.
1. Blk.A, Lot 14 end of street near Sandy Lake, MLV needs con-
crete pad poured around it.
2. Blk.A, Lot 14, raise sewer cleanout to Grade Level.
e
Blk.A., between lots 15 & 16, need to install FH valves.
Blk.A, Lot 19, raise sewer cleanout to grade level.
Blk.A, Lot 19, FH needs AML valve installed.
Blk.A, Sandy Lake and Woodland Cove need to pour pad around
MLVo
Blk.A, Lot 29, sewer cleanout is full of mud & shavings.
Blk.A, Lot 30, sewer cleanout is full of mud. Clean it e~t~-
e
10.
11.
12.
13.
Blk.A, Lot 31, sewer cleanout needs raised to grade level.
Blk.A Lot 32, sewer cleanout needs raised to grade level.
Blk.A
Blk.A
Blk.A
Lot 34,
Lot 35,
Lot 35,
raise cleanout to grade level.
raise cleanout to grade level.
raise sewer manhole to grade level; also full
of water.
14. Blk.A, Lot 35, near Sandy Lake ML valve needs concrete pad
poured around it.
15. Blk.A, Lot 36, service line does not flow water.
16. Blk.A, Lot 37, all utilities need to be installed.
17. Blk.A, Lot 38, all utilities need to be installed.
18.
19.
20.
21.
22.
23.
24.
25.
Blk.A, Lot 1,
Blk.A, Lot 2,
Blk.A, Lot 3,
Blk.A, Lot 5,
Blk.A, Lot 6,
Blk.A, Lot 7,
Blk.A,
Blk.A,
HF leaking at bottom.
raise sewer cleanout to grade level.
raise sewer cleanout to grade level.
raise sewer cleanout to grade level.
raise sewer cleanout to grade level.
ralse sewer cleanout to grade level.
Lot 10 raise sewer cleanout to grade level.
Lot 11 raise sewer cleanout to grade level.