Forest Cove 2-CS 980701 (2)COPPELL STREETS Di-v-ZSIC~q
July 1, 1998
Larry Davis,
Brent Adan~,
Walk-thru Forest Cove Phase II,
Construction Inspector
Streets Division
June 30,
1998
Listed below are Street Division comments relative to walk thru.
1. Scallop cracking at header.
2. Clean pipe.
3. Wrong object markers not installed properly *too shallow*.
4. Fill around valve stacks along Sandy Lake.
5. Grade ditch to dra~n.
e
Check all curbs - reseal.
Redwood not sealed.
8. Reseal header south side.
9. Random crack.