Loading...
Forest Cove 2-PT 980604Bore/Excavation in Public Right-Of-Way Permit City of Coppe!l - Public Works Permit Issued To: Name: Address: Phone: Department ~mergency~hcne: Remresenting: ?ype of Work/General Description: Location of Work: Ilave Ail City and/or Franchise Utilities Been Contacted and E~isting Utilities Located: YES Will It Be Necessary to Excavate Street, ALley or Sidewalk Pavement7 YES (attach permit) ~/ NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. ,~rea(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Departments prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PER/tIT Attach Barricading/Detour Plan if a lane or street closure is applicable. Franchise/Contractor Represe~Da~Je Franchise Inspector/or City Inspector Date Applicant shall indemnify and forever hold harmless against each and eve~/ claim, demand or cause of action that may be made or come against i~ by reason of or if any way arising out of the closure, blockinq, excavating, cutting, tunneling, or other work by the applican~ under permit from the City, if such permit is granted. PERMIT. PIIB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. NOW ET BOR~SALLOWED! ~