Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Fountain Park 2-CS020605
DEVELOPMENT FEES PROJECT NAME: ENGINEER: REV S ON DATE: Forest Cove, Phase 1 & 2 Carter & Burgess 6/5/02 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 1/28/98 1/28/98 6/3/02 1/28/98 6/25/98 6/25/98 6/25/98 6/25/98 6/3/02 1/28/98 5/11/98 6/3/02 Park Fee (Ph. 1 ) $66,640.00 $56,540.00 2/2/98 Park Fee (Ph.2) $55,255.00 $b5,255.00 3/26/98 Water Impact Fee (Ph.1) $22,050.00 $22,060.00 2/2/98 Water Impact Fee (Ph.2) $19,350.00 $19,350.00 3/26/98 Impact fee (irrigation) $700.00 $700.00 6/3/02 Wastewater Impact (Ph.l~ $19,800.00 $19,800.00 2/2/98 Wastewater Impact (Ph.2~ $19,350.00 $19,380.00 3/26/98 Street Sign (Phase 1) $1,221.67 $1,221.67 6/29/98 Street Sign (Phase 2) $901.23 $901.23 6/29/98 Street Light (Phase 1) $2,340.80 $2,340.80 6/29/98 Street Light (Phase 2) $2,926.00 $2,926.00 6/29/98 Const. Insp.(grading, Ph.ll $1,848.90 $1,848.90 1/8/98 Const. Inspection (Ph. 1 ) $17,216.66 $17,216.66 2/2/98 Const. Insp.(grading, Ph.21 $3,022.92 $3,022.92 2/23/98 Const. Inspection (Ph.2) $15,848.23 $15,848.23 3/26/98 Inspection fee $16.00 $16.00 6/3/02 Road Impact-Zone 5 (Ph.1 $37,620.00 $37,620.00 2/2/98 Road Impact-Zone 5 (Ph.2 $36,765.00 $36,765.00 3/26/98 Overtime Insp. (5/9, Ph. 2) $240.00 $240.00 4/20/99 R-O-W permit $100.00 $100.00 6/3/02 Water Tap Inspection $50.00 $50.00 di 6/3/02 Wastewater Tap Inspection Water Meter (Domestic) $62.25 $62.25 di 6/3/02 Water Meter (Fire/Irrig) Meter Deposit (Domestic) $30,00 $30.00 di 6/3/02 Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS $50.00 $50.00 di 6/3/02 TotalFees Fees Paid Amount Owed $313,304.66 $313,304.66 $0.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Canst. Plan Approved Irrigation Plan Recd. NOTES 06/21/99 Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control ($7,938.00 Ph .2)