Loading...
Fountain Park 2-CS 980826COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 August 26, 1998 Mr. Tim House 1680 Stemmons Frwy, Suite 280 Lewisville, TX 75067 RE: Fountain Park Phase II Final Acceptance Dear Mr. House: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Construction Inspector CCi Mike Martin, Assistant City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Rick Van Guilder, C.W. Young Construction Lynn Kadleck, Kadleck Associates Fax (817) 477-1414 Fax (972) 702-0771 davi~/flnprk2, fac