Loading...
Fountain Park 2-CS 980820COPPELL STREETS DMSIO~ DATE: August 20, TO: Larry Davis, FROM: Brent Adams, RE: 1998 Construction Inspector Streets Division Walk-thru Fountain Park Phase II Listed below are Street Division comments relative to walk thru. 1. Everything OK. MEMORANDUM To: From: RE: Date: Mike Martin, Asst. City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works C-reg Jones, Chief Building Official Travis Crump, Fire Marshal FINAL WALK-THRU for Fountain Park Phase H August 13, 1998 A final walk-thru for streets, utilities and drainage on the referenced project hss been scheduled for Tuesday, August 18, 1998 at 8:30 a.m. If I can be of further assistance please let me know. cc: Tim House, Matthews Southwest Rick Van Gilder, CW Young Fax 221-1217 Fax 477-3519 MESSAGE CONF I RMAT I ON 08/24,~98 14: 58 ID--CITY OF COPPELL DATE 08-'24 S~R-TIME DISTANT STATION ID 00'21" CITY OF COPPELL MODE PAGES RESULT CALLING 01 OK 0000