Loading...
Dry Clean & Donut-CS010605T H E C I T Y O F June 5, 2001 Nhan V. Nguyen 2825 Kings Gate Drive Carrollton, TX 75006 RE: Dry Clean City Addition, Lot 1, Block A Fee Assessment Letter MrNguyen: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. The fees were assessed based on information provided to the City fi.om Mr. Mark Wainseott. If any of the information that Mr. Wainscott provided changes then the impact fees will need to be reassessed. Please make payment for the Impact Fees to the City of Coppell in the mount of $14,043.28 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest. Meters will be ordered when these fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer Jennifer Armstrong, Finance Director Rhon~a Brothers, Engineering Secretary ~,~llowell, ~,D~r of,[~!btic Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEES PROJECT NAME: Dry Clean City ENGINEER: OR G NAT ON DATE: 6/5/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee 6/5/01 Water Impact Fee $4,725.00 $4,725,00 6/6/01 6/,5/01 Wastewater Impact Fee $3,600,00 $3,600.00 6/6/01 Street Sign Street Ught notify street dept. 7/13/01 Construction Inspection $4,846,00 $4,846.00 7/13/01 6/5/01 Roadway Impact-Zone $5,718.28 $8,718.28 6/6/01 Street Cut Permit Overtime Inspection WaterTap Inspection $100,00 $100.00 di Wastewater Tap Inspectio $50.00 $50.00 di Water Meter (Domestic) $189.37 $189.37 di Water Meter (Fire/Irrig) $62.74 $62,74 di Meter Deposit (Domestic) $35,00 $35.00 di Meter Deposit (Fire/Irrig) $30.00 $30.00 di Utility Final inspection $50.00 $50.00 di Total Fees Fees Paid TOTALS $19,406.39 $19,406.39 3/13/03 3/13/03 3/13/03 3/13/03 3/13/03 3/13/03 3/13/03 Amount Owed $0.00 Prior To Construction Erosion Control Approved E.P.A.-N,O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd, Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEES PROJECT NAME: ENGINEER: OR G NATION DATE: Dry Clean City 6/5/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 6/5/01 6/5/01 6/5/01 Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS $4,725.00 $3,600.00 $5,718.28 $100.00 $50.00 $189.37 $62.74 $35.00 $30.00 $50.00 Total Fees $14,560.39 $4,725.00 $3,600.00 notify street dept. $5,718.28 Notify utility dept. when meters, taps or deposits are paid Fees Paid $14,043.28 6/6/01 6/6/01 6/6/01 Amount Owed $517.11 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEE WORKSHEET "~ROJECT: Dry Clean City Addition, Lot 1, Block A #ATE: 6/5/01 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's 1 - 1 inch = 2.5 ESU's 0 = 0 ESU's 0 -- 0 ESU's Total #: 10.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $189.37 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) ~-'rigation/Fireline Water Meter Fee: Total 0: 1 Irrigation Meter(s) @ $62.74 Total #; 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): -'-'- Total #: 1 Lots @ $50.00 ea. (100% ~ue prior to issuance of building permit) $4,725.00 $100.00 $189.37 $62.74 $o.oo $o.oo $35.0O $3O.00 $3,600.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans ara submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 $5,718.28 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost requirad for public improvements) Information not Available Page 2 DEVELOPMENT FEE TABLE Project: Dry Clean City Addition, Lot 1, Block A Date: ~/$/01 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,725.00 $4,725.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $189.37 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $62.74 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100 % due at Issuance of Building Permi0 Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $5,718.28 $5,718.28 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project I[ Street Sign Fee Information not Available (100% due prior to Acceptance of Project I[ Construction Inspection Fee Information not Available TOTAL $14,560.39 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $14,043.28