Loading...
Dynasty Cleaners-CS020605 #of ~,~ Post-it® Fax Note 7671 Date ~'~'0~= pages ./ To "~r~v ~L~JI~'i~ F~m D~ co.~o~pt. BL~. I~. :o. UTIUTI~ Phone ~ Phone ~ F~ ~ Fax ~ DEVELOPMENT FEES PROJECT NAME: Dynasty Cleaners ENGINEER: Enoch, Inc. OR G NATION DATE: 3/27/02 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee $0.00 3/27/02 Water Impact Fee $3,640.00 3/27/02 Wastewater Impact Fee $2,240.00 Street Sign Street Light 5/9/02 Construction Inspection $3,364,08 $3,364.08 rb 5/9/02 3/27/02 Roadway Impact-Zone $14,417,33 $14,417.33 rb 3/27/02 2% Early Grading Permit $461.39 $461.39 rb 3/27/02 Overtime Inspection Water Tap Inspection $150.00 $100.00 di 6/5/02 Wastewater Tap Inspectio $50.00 $50.00 di 6/5/02 Water Meter (Domestic) $205.28 8205.28 di 6/5/02 Water Meter (Fire/Irrig) $2,154.69 $62.25 di 6/5/02 Meter Deposit (Domestic) $30.00 $30.00 di 6/5/02 Meter Deposit (Fire/Irrig) $60.00 $30.00 di 6/5/02 Utility Final Inspection $50.00 $50.00 di 6/5/02 Subtotal due to Eng. $18,242.80 $18,242.80 $0.00 Total Fees Fees Paid Amount Owed TOTALS $26,822.77 $18,770.33 $8,052.44 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. MESSAGE CONFIRMATION 06×05×02 10:51 IDzCITY OF COPPELL DATE 06×05 S~R-TIME DISTANT STATION ID MODE PAGES 00'55" 9?23043514 CALLING 02 RESULT OK 0000